  "id": "a7",
  "ref": "A7",
  "name": "A7 Autostrada Moldovei",
  "status": "partial_open",
  "status_label": "Parțial deschis",
  "status_detail": "Parțial deschis: 257,9 din 452,9 km",
  "open_km": 257.86,
  "total_km": 452.92,
  "sections": [
    {
      "id": "sec-a7-pl-bz",
      "name": "Ploiești – Buzău",
      "status": "open",
      "status_label": "Deschis",
      "status_detail": "Deschis: 63,3 km",
      "open_km": 63.25,
      "total_km": 63.25,
      "lots": [
        {
          "id": "lot-a7-pl-bz-l1",
          "lot_id": "lot-a7-pl-bz-l1",
          "name": "Lotul 1: Dumbrava – Mizil",
          "lot_name": "Lotul 1: Dumbrava – Mizil",
          "length_km": 21,
          "profile": "motorway",
          "status": "open",
          "status_label": "Deschis",
          "status_detail": "Deschis: 21,0 km",
          "contractor": "Impresa Pizzarotti & C. SpA – Retter Project Management",
          "contract_value": "1.468 mld. lei (fără TVA)",
          "financing": "PNRR",
          "progress_percent": 100,
          "contractual_date": "2024-10",
          "estimated_date": null,
          "actual_date": "2024-12-23",
          "attributed_range": null,
          "is_hand_drawn": false,
          "bbox": [
            26.206225,
            44.859524,
            26.443208,
            44.947876
          ]
        },
        {
          "id": "lot-a7-pl-bz-l2",
          "lot_id": "lot-a7-pl-bz-l2",
          "name": "Lotul 2: Mizil – Pietroasele",
          "lot_name": "Lotul 2: Mizil – Pietroasele",
          "length_km": 28.35,
          "profile": "motorway",
          "status": "open",
          "status_label": "Deschis",
          "status_detail": "Deschis: 28,4 km",
          "contractor": "Asocierea Coni SRL – Trace Group Hold PLC",
          "contract_value": "1.249 mld. lei (fără TVA)",
          "financing": "PNRR",
          "progress_percent": 100,
          "contractual_date": "2024-10",
          "estimated_date": null,
          "actual_date": "2025-10-17",
          "attributed_range": null,
          "is_hand_drawn": false,
          "bbox": [
            26.443208,
            44.947876,
            26.744097,
            45.080563
          ]
        },
        {
          "id": "lot-a7-pl-bz-l3",
          "lot_id": "lot-a7-pl-bz-l3",
          "name": "Lotul 3: Pietroasele – Buzău",
          "lot_name": "Lotul 3: Pietroasele – Buzău",
          "length_km": 13.9,
          "profile": "motorway",
          "status": "open",
          "status_label": "Deschis",
          "status_detail": "Deschis: 13,9 km",
          "contractor": "Asocierea Nurol – Makyol",
          "contract_value": "1.093 mld. lei (fără TVA)",
          "financing": "PNRR",
          "progress_percent": 100,
          "contractual_date": "2025-11",
          "estimated_date": null,
          "actual_date": "2025-11-27",
          "attributed_range": null,
          "is_hand_drawn": false,
          "bbox": [
            26.744097,
            45.080563,
            26.878872,
            45.130448
          ]
        }
      ]
    },
    {
      "id": "sec-a7-bz-foc",
      "name": "Buzău – Focșani",
      "status": "open",
      "status_label": "Deschis",
      "status_detail": "Deschis: 82,4 km",
      "open_km": 82.44,
      "total_km": 82.44,
      "lots": [
        {
          "id": "lot-a7-bz-foc-l1",
          "lot_id": "lot-a7-bz-foc-l1",
          "name": "Lotul 1: Buzău – Vadu Pașii",
          "lot_name": "Lotul 1: Buzău – Vadu Pașii",
          "length_km": 4.6,
          "profile": "motorway",
          "status": "open",
          "status_label": "Deschis",
          "status_detail": "Deschis: 4,6 km",
          "contractor": "Asocierea SA&PE Construct – Spedition UMB – Tehnostrade",
          "contract_value": "689 mil. lei (fără TVA)",
          "financing": "PNRR",
          "progress_percent": 100,
          "contractual_date": "2025-07",
          "estimated_date": null,
          "actual_date": "2025-07-11",
          "attributed_range": null,
          "is_hand_drawn": false,
          "bbox": [
            26.878872,
            45.130448,
            26.913173,
            45.160178
          ]
        },
        {
          "id": "lot-a7-bz-foc-l2",
          "lot_id": "lot-a7-bz-foc-l2",
          "name": "Lotul 2: Vadu Pașii – Râmnicu Sărat",
          "lot_name": "Lotul 2: Vadu Pașii – Râmnicu Sărat",
          "length_km": 30.8,
          "profile": "motorway",
          "status": "open",
          "status_label": "Deschis",
          "status_detail": "Deschis: 30,8 km",
          "contractor": "Asocierea SA&PE Construct – Spedition UMB – Tehnostrade",
          "contract_value": "1.317 mld. lei (fără TVA)",
          "financing": "PNRR",
          "progress_percent": 100,
          "contractual_date": "2025-04",
          "estimated_date": null,
          "actual_date": "2024-11-20",
          "attributed_range": null,
          "is_hand_drawn": false,
          "bbox": [
            26.913173,
            45.160178,
            27.096664,
            45.382665
          ]
        },
        {
          "id": "lot-a7-bz-foc-l3",
          "lot_id": "lot-a7-bz-foc-l3",
          "name": "Lotul 3: Râmnicu Sărat – Mândrești Munteni",
          "lot_name": "Lotul 3: Râmnicu Sărat – Mândrești Munteni",
          "length_km": 36.1,
          "profile": "motorway",
          "status": "open",
          "status_label": "Deschis",
          "status_detail": "Deschis: 36,1 km",
          "contractor": "Asocierea SA&PE Construct – Spedition UMB – Tehnostrade",
          "contract_value": "1.469 mld. lei (fără TVA)",
          "financing": "PNRR",
          "progress_percent": 100,
          "contractual_date": "2025-04",
          "estimated_date": null,
          "actual_date": "2024-12-20",
          "attributed_range": null,
          "is_hand_drawn": false,
          "bbox": [
            27.094548,
            45.382665,
            27.240497,
            45.672257
          ]
        },
        {
          "id": "lot-a7-bz-foc-l4",
          "lot_id": "lot-a7-bz-foc-l4",
          "name": "Lotul 4: Mândrești Munteni – Focșani Nord",
          "lot_name": "Lotul 4: Mândrești Munteni – Focșani Nord",
          "length_km": 10.94,
          "profile": "motorway",
          "status": "open",
          "status_label": "Deschis",
          "status_detail": "Deschis: 10,9 km",
          "contractor": "Asocierea SA&PE Construct – Spedition UMB – Tehnostrade",
          "contract_value": "763.72 mil. lei (fără TVA)",
          "financing": "PNRR",
          "progress_percent": 100,
          "contractual_date": "2024-08",
          "estimated_date": null,
          "actual_date": "2024-11-07",
          "attributed_range": null,
          "is_hand_drawn": false,
          "bbox": [
            27.21126,
            45.672257,
            27.270126,
            45.734951
          ]
        }
      ]
    },
    {
      "id": "sec-a7-foc-bc",
      "name": "Focșani – Bacău",
      "status": "open",
      "status_label": "Deschis",
      "status_detail": "Deschis: 95,9 km",
      "open_km": 95.9,
      "total_km": 95.9,
      "lots": [
        {
          "id": "lot-a7-foc-bc-l1",
          "lot_id": "lot-a7-foc-bc-l1",
          "name": "Lotul 1: Focșani – Domnești Târg",
          "lot_name": "Lotul 1: Focșani – Domnești Târg",
          "length_km": 35.6,
          "profile": "motorway",
          "status": "open",
          "status_label": "Deschis",
          "status_detail": "Deschis: 35,6 km",
          "contractor": "Asocierea SA&PE Construct – Spedition UMB – Tehnostrade",
          "contract_value": "2.354 mld. lei (fără TVA)",
          "financing": "PNRR",
          "progress_percent": 100,
          "contractual_date": "2025-11",
          "estimated_date": null,
          "actual_date": "2025-12-23",
          "attributed_range": null,
          "is_hand_drawn": false,
          "bbox": [
            27.170432,
            45.734951,
            27.21702,
            46.029257
          ]
        },
        {
          "id": "lot-a7-foc-bc-l2",
          "lot_id": "lot-a7-foc-bc-l2",
          "name": "Lotul 2: Domnești Târg – Răcăciuni",
          "lot_name": "Lotul 2: Domnești Târg – Răcăciuni",
          "length_km": 38.78,
          "profile": "motorway",
          "status": "open",
          "status_label": "Deschis",
          "status_detail": "Deschis: 38,8 km",
          "contractor": "Asocierea SA&PE Construct – Spedition UMB – Tehnostrade",
          "contract_value": "2.485 mld. lei (fără TVA)",
          "financing": "PNRR",
          "progress_percent": 100,
          "contractual_date": "2025-11",
          "estimated_date": null,
          "actual_date": "2026-08-31",
          "attributed_range": null,
          "is_hand_drawn": false,
          "bbox": [
            27.023603,
            46.029257,
            27.210393,
            46.331495
          ]
        },
        {
          "id": "lot-a7-foc-bc-l3",
          "lot_id": "lot-a7-foc-bc-l3",
          "name": "Lotul 3: Răcăciuni – Bacău",
          "lot_name": "Lotul 3: Răcăciuni – Bacău",
          "length_km": 21.52,
          "profile": "motorway",
          "status": "open",
          "status_label": "Deschis",
          "status_detail": "Deschis: 21,5 km",
          "contractor": "Asocierea SA&PE Construct – Spedition UMB – Tehnostrade",
          "contract_value": "1.673 mld. lei (fără TVA)",
          "financing": "PNRR",
          "progress_percent": 100,
          "contractual_date": "2025-11",
          "estimated_date": null,
          "actual_date": "2026-08-31",
          "attributed_range": null,
          "is_hand_drawn": false,
          "bbox": [
            26.922861,
            46.331495,
            27.023603,
            46.497379
          ]
        }
      ]
    },
    {
      "id": "sec-a7-centura-bc",
      "name": "Centura Bacău",
      "status": "open",
      "status_label": "Deschis",
      "status_detail": "Deschis: 16,3 km",
      "open_km": 16.27,
      "total_km": 16.27,
      "lots": [
        {
          "id": "lot-a7-centura-bc",
          "lot_id": "lot-a7-centura-bc",
          "name": "Varianta Ocolitoare Bacău (Profil Autostradă)",
          "lot_name": "Varianta Ocolitoare Bacău (Profil Autostradă)",
          "length_km": 16.27,
          "profile": "motorway",
          "status": "open",
          "status_label": "Deschis",
          "status_detail": "Deschis: 16,3 km",
          "contractor": "Asocierea Spedition UMB – Tehnostrade",
          "contract_value": "668.33 mil. lei (fără TVA)",
          "financing": "POIM / Buget de stat",
          "progress_percent": 100,
          "contractual_date": "2022-01",
          "estimated_date": null,
          "actual_date": "2020-12-02",
          "attributed_range": null,
          "is_hand_drawn": false,
          "bbox": [
            26.931269,
            46.497379,
            26.969982,
            46.637723
          ]
        }
      ]
    },
    {
      "id": "sec-a7-bc-pas",
      "name": "Bacău – Pașcani",
      "status": "construction",
      "status_label": "În execuție",
      "status_detail": "În execuție: 77,4 km",
      "open_km": 0,
      "total_km": 77.39,
      "lots": [
        {
          "id": "lot-a7-bc-pas-l1",
          "lot_id": "lot-a7-bc-pas-l1",
          "name": "Lotul 1: Săucești – Trifești",
          "lot_name": "Lotul 1: Săucești – Trifești",
          "length_km": 30.3,
          "profile": "motorway",
          "status": "construction",
          "status_label": "În execuție",
          "status_detail": "În execuție: 30,3 km",
          "contractor": "Asocierea SA&PE Construct – Spedition UMB – Tehnostrade",
          "contract_value": "1.638 mld. lei (fără TVA)",
          "financing": "PNRR",
          "progress_percent": 80,
          "contractual_date": null,
          "estimated_date": "2026-Q4",
          "actual_date": null,
          "attributed_range": null,
          "is_hand_drawn": false,
          "bbox": [
            26.867455,
            46.637723,
            26.931269,
            46.892563
          ]
        },
        {
          "id": "lot-a7-bc-pas-l2",
          "lot_id": "lot-a7-bc-pas-l2",
          "name": "Lotul 2: Trifești – Gherăești (Mircești)",
          "lot_name": "Lotul 2: Trifești – Gherăești (Mircești)",
          "length_km": 19,
          "profile": "motorway",
          "status": "construction",
          "status_label": "În execuție",
          "status_detail": "În execuție: 19,0 km",
          "contractor": "Asocierea SA&PE Construct – Spedition UMB – Tehnostrade",
          "contract_value": "1.278 mld. lei (fără TVA)",
          "financing": "PNRR",
          "progress_percent": 65,
          "contractual_date": "2026-10-10",
          "estimated_date": "2026-Q4",
          "actual_date": null,
          "attributed_range": null,
          "is_hand_drawn": false,
          "bbox": [
            26.835798,
            46.892563,
            26.878903,
            47.050075
          ]
        },
        {
          "id": "lot-a7-bc-pas-l3",
          "lot_id": "lot-a7-bc-pas-l3",
          "name": "Lotul 3: Mircești – Pașcani",
          "lot_name": "Lotul 3: Mircești – Pașcani",
          "length_km": 28.09,
          "profile": "motorway",
          "status": "construction",
          "status_label": "În execuție",
          "status_detail": "În execuție: 28,1 km",
          "contractor": "Asocierea SA&PE Construct – Spedition UMB – Tehnostrade",
          "contract_value": "1.76 mld. lei (fără TVA)",
          "financing": "PNRR",
          "progress_percent": 55.7,
          "contractual_date": "2026-12-22",
          "estimated_date": "2027-Q2",
          "actual_date": null,
          "attributed_range": null,
          "is_hand_drawn": false,
          "bbox": [
            26.689688,
            47.050075,
            26.849276,
            47.263219
          ]
        }
      ]
    },
    {
      "id": "sec-a7-pas-sv",
      "name": "Pașcani – Suceava",
      "status": "design",
      "status_label": "În proiectare",
      "status_detail": "În proiectare: 62,0 km",
      "open_km": 0,
      "total_km": 61.97,
      "lots": [
        {
          "id": "lot-a7-pas-sv-l1",
          "lot_id": "lot-a7-pas-sv-l1",
          "name": "Lotul 1: Pașcani – Roșcani",
          "lot_name": "Lotul 1: Pașcani – Roșcani",
          "length_km": 33,
          "profile": "motorway",
          "status": "design",
          "status_label": "În proiectare",
          "status_detail": "În proiectare: 33,0 km",
          "contractor": "Asocierea SA&PE Construct – Spedition UMB – Tehnostrade",
          "contract_value": "3.068 mld. lei (fără TVA)",
          "financing": "Programul Transport 2021-2027, ulterior SAFE",
          "progress_percent": 0,
          "contractual_date": null,
          "estimated_date": null,
          "actual_date": null,
          "attributed_range": null,
          "is_hand_drawn": false,
          "bbox": [
            26.585951,
            47.263219,
            26.70023,
            47.513396
          ]
        },
        {
          "id": "lot-a7-pas-sv-l2",
          "lot_id": "lot-a7-pas-sv-l2",
          "name": "Lotul 2: Roșcani – Suceava (Aeroport)",
          "lot_name": "Lotul 2: Roșcani – Suceava (Aeroport)",
          "length_km": 28.97,
          "profile": "motorway",
          "status": "design",
          "status_label": "În proiectare",
          "status_detail": "În proiectare: 29,0 km",
          "contractor": "Asocierea SA&PE Construct – Spedition UMB – Tehnostrade",
          "contract_value": "2.863 mld. lei (fără TVA)",
          "financing": "Programul Transport 2021-2027, ulterior SAFE",
          "progress_percent": 0,
          "contractual_date": null,
          "estimated_date": null,
          "actual_date": null,
          "attributed_range": null,
          "is_hand_drawn": false,
          "bbox": [
            26.322749,
            47.513396,
            26.585951,
            47.679768
          ]
        }
      ]
    },
    {
      "id": "sec-a7-sv-sir",
      "name": "Suceava – Siret",
      "status": "tender",
      "status_label": "În licitație",
      "status_detail": "În licitație: 55,7 km",
      "open_km": 0,
      "total_km": 55.7,
      "lots": [
        {
          "id": "lot-a7-sv-sir-l1",
          "lot_id": "lot-a7-sv-sir-l1",
          "name": "Lotul 1: Suceava – Dărmănești",
          "lot_name": "Lotul 1: Suceava – Dărmănești",
          "length_km": 18.6,
          "profile": "expressway",
          "status": "tender",
          "status_label": "În licitație",
          "status_detail": "În licitație: 18,6 km",
          "contractor": "Asocierea FAR FOUNDATION SRL - AUTOMAGISTRAL PIVDEN SRL - LINCOR TRANS SRL",
          "contract_value": "2.09 mld. lei fără TVA (oferta Far Foundation, atribuire anulată)",
          "financing": "SAFE",
          "progress_percent": null,
          "contractual_date": null,
          "estimated_date": null,
          "actual_date": null,
          "attributed_range": null,
          "is_hand_drawn": false,
          "bbox": [
            26.135,
            47.679768,
            26.322749,
            47.74
          ]
        },
        {
          "id": "lot-a7-sv-sir-l2",
          "lot_id": "lot-a7-sv-sir-l2",
          "name": "Lotul 2: Dărmănești – Bălcăuți",
          "lot_name": "Lotul 2: Dărmănești – Bălcăuți",
          "length_km": 24.45,
          "profile": "expressway",
          "status": "tender",
          "status_label": "În licitație",
          "status_detail": "În licitație: 24,5 km",
          "contractor": "FAR FOUNDATION SRL – AUTOMAGISTRAL PIVDEN – LINCOR TRANS",
          "contract_value": "1.63 mld. lei fără TVA (oferta Far Foundation, atribuire anulată)",
          "financing": "SAFE",
          "progress_percent": null,
          "contractual_date": null,
          "estimated_date": null,
          "actual_date": null,
          "attributed_range": null,
          "is_hand_drawn": false,
          "bbox": [
            26.075,
            47.74,
            26.135,
            47.895
          ]
        },
        {
          "id": "lot-a7-sv-sir-l3",
          "lot_id": "lot-a7-sv-sir-l3",
          "name": "Lotul 3: Bălcăuți – Siret (Vama Siret)",
          "lot_name": "Lotul 3: Bălcăuți – Siret (Vama Siret)",
          "length_km": 12.65,
          "profile": "expressway",
          "status": "tender",
          "status_label": "În licitație",
          "status_detail": "În licitație: 12,7 km",
          "contractor": "Asocierea Far Foundation – Automagistral Pivden – Lincor Trans",
          "contract_value": "1.45 mld. lei fără TVA (oferta Far Foundation)",
          "financing": "SAFE",
          "progress_percent": 0,
          "contractual_date": null,
          "estimated_date": null,
          "actual_date": null,
          "attributed_range": null,
          "is_hand_drawn": false,
          "bbox": [
            26.059,
            47.895,
            26.075,
            47.986
          ]
        }
      ]
    }
  ],
  "stories": [
    {
      "id": "sc-e9ca20843911",
      "title": "VIDEO | A7 Bacău – Pașcani: Podul de 520 de metri peste râul Moldova, de lângă Pildești, avansează. Lotul 2 a ajuns la…",
      "extracted_headline": "Umbrărescu a mobilizat muncitori la podul peste Moldova de pe A7, Lotul 2 Trifești–Gherăești",
      "summary": "Compania condusă de Umbrărescu a mobilizat muncitori la podul peste Moldova pe Autostrada A7, tronson Bacău–Pașcani, pe 22 noiembrie 2026.",
      "url": "https://economedia.ro/video-a7-bacau-pascani-podul-de-520-de-metri-peste-raul-moldova-de-langa-pildesti-avanseaza-lotul-2-a-ajuns-la-un-stadiu-fizic-de-63.html",
      "published_at": "2026-11-22T11:15:16Z",
      "roads": [
        "A7"
      ],
      "lot_id": "lot-a7-bc-pas-l2",
      "lot_ids": [
        "lot-a7-bc-pas-l2"
      ],
      "source": {
        "id": "economedia",
        "name": "Economedia",
        "trust_tier": 2
      },
      "co_citations": [
        {
          "id": "art-6da64844fa90",
          "source_name": "Profit.ro",
          "url": "https://www.profit.ro/povesti-cu-profit/auto-transporturi/video-umbrarescu-a-adus-muncitori-la-podul-peste-moldova-pe-autostrada-a7-bacau-pascani-23003825",
          "title": "VIDEO Umbrărescu a adus muncitori la podul peste Moldova, pe Autostrada A7 Bacău - Pașcani"
        }
      ]
    },
    {
      "id": "sc-8b6d9e86256e",
      "title": "VIDEO Autostrada Moldovei A7: Muncitorii UMB, la lucru pe șantier în ciuda avertizărilor de ploi și vânt puternic…",
      "extracted_headline": "Lucrările avansează pe cele trei loturi ale Autostrăzii A7 Bacău–Pașcani",
      "summary": "DRDP Iași raportează progrese în noiembrie 2026: Lot 1 77%, Lot 2 63% și Lot 3 55,70% pe A7 Bacău–Pașcani.",
      "url": "https://www.economica.net/autostrada-moldovei-a7-80_996242.html",
      "published_at": "2026-11-17T12:56:22Z",
      "roads": [
        "A7"
      ],
      "lot_id": "lot-a7-bc-pas-l1",
      "lot_ids": [
        "lot-a7-bc-pas-l1",
        "lot-a7-bc-pas-l2",
        "lot-a7-bc-pas-l3"
      ],
      "source": {
        "id": "economica",
        "name": "Economica.net",
        "trust_tier": 2
      },
      "co_citations": [
        {
          "id": "art-4296c4397a16",
          "source_name": "Arena Construcțiilor",
          "url": "https://arenaconstruct.ro/autostrada-a7-bacau-pascani-avanseaza-lucrarile-pe-cele-trei-loturi",
          "title": "Autostrada A7 Bacau – Pascani: Avanseaza lucrarile pe cele trei loturi"
        },
        {
          "id": "art-9a743b561384",
          "source_name": "Economica.net",
          "url": "https://www.economica.net/autostrada-a7-bacau-pascani-23_997498.html",
          "title": "VIDEO Autostrada A7 Bacău - Pașcani: Au fost montate toate grinzile podului peste Moldova. Ce lucrări mai execută…"
        }
      ]
    },
    {
      "id": "sc-472fd24d7ad7",
      "title": "Pe Autostrada Moldovei se fură până și vase de WC | PROFIT.ro",
      "extracted_headline": "Furturi la spațiile de servicii și progrese pe loturile 1–2 ale Autostrăzii Moldovei A7",
      "summary": "Autoritățile semnalează furturi repetate în spațiile de servicii de pe A7; Loturile 1 și 2 (Bacău–Pașcani) avansează la 80% și 65%, publicat 2026-11-13.",
      "url": "https://www.profit.ro/povesti-cu-profit/auto-transporturi/pe-autostrada-moldovei-se-fura-pana-si-vase-de-wc-22985435",
      "published_at": "2026-11-13T14:42:00Z",
      "roads": [
        "A7"
      ],
      "lot_id": "lot-a7-bc-pas-l1",
      "lot_ids": [
        "lot-a7-bc-pas-l1",
        "lot-a7-bc-pas-l2"
      ],
      "source": {
        "id": "profit",
        "name": "Profit.ro",
        "trust_tier": 2
      },
      "co_citations": []
    },
    {
      "id": "sc-4c491f5890be",
      "title": "A7 Bacău - Pașcani: Constructorul vrea să termine 49,3 km în 2026. Banii de la buget, decisivi pentru finalizare",
      "extracted_headline": "UMB: Lotul 1 A7 Bacău–Pașcani 80% și Lotul 2 65%; CNAIR cere bani de la buget",
      "summary": "CNAIR anunță pe 10 noiembrie 2026 că UMB a atins 80% pe Lotul 1 și 65% pe Lotul 2 ale Autostrăzii A7 Bacău–Pașcani și cere finanțare de la buget pentru continuare.",
      "url": "https://www.mediafax.ro/social/a7-bacau-pascani-constructorul-vrea-sa-termine-493-km-in-2026-banii-de-la-buget-decisivi-pentru-finalizare-23840961",
      "published_at": "2026-11-10T16:41:10Z",
      "roads": [
        "A7"
      ],
      "lot_id": "lot-a7-bc-pas-l1",
      "lot_ids": [
        "lot-a7-bc-pas-l1",
        "lot-a7-bc-pas-l2",
        "lot-a7-bc-pas-l3"
      ],
      "source": {
        "id": "mediafax",
        "name": "Mediafax",
        "trust_tier": 2
      },
      "co_citations": [
        {
          "id": "art-0b8442499053",
          "source_name": "Economica.net",
          "url": "https://www.economica.net/autostrada-a7-bacau-pascani-22_993922.html",
          "title": "VIDEO Autostrada A7 Bacău – Pașcani: Umbrărescu a mobilizat 1000 de muncitori pentru a finaliza în 2026 primele două…"
        },
        {
          "id": "art-681e6e89313a",
          "source_name": "Economedia",
          "url": "https://economedia.ro/video-autostrada-a7-bacau-pascani-umb-a-ajuns-la-80-pe-lotul-1-si-la-65-pe-lotul-2-cnair-cere-bani-de-la-buget-pentru-continuarea-lucrarilor.html",
          "title": "VIDEO | Autostrada A7 Bacău–Pașcani: UMB a ajuns la 80% pe lotul 1 și la 65% pe lotul 2. CNAIR cere bani de la buget…"
        }
      ]
    },
    {
      "id": "sc-64882beabca0",
      "title": "Cum avansează lucrările la Autostrada Bacău-Pașcani. Ce condiții trebuie îndeplinite pentru a fi gata în 2026 | Digi…",
      "extracted_headline": "UMB vrea să finalizeze în 2026 primele două loturi ale Autostrăzii Bacău–Pașcani",
      "summary": "Constructorul UMB lucrează pe Loturile 1 şi 2 ale Autostrăzii Bacău–Pașcani (49,3 km) şi încearcă să le finalizeze până la sfârşitul anului 2026.",
      "url": "https://www.digi24.ro/digieconomic/consumer/cum-avanseaza-lucrarile-la-autostrada-bacau-pascani-ce-conditii-trebuie-indeplinite-pentru-a-fi-gata-in-2026-126445",
      "published_at": "2026-11-10T15:42:06Z",
      "roads": [
        "A7"
      ],
      "lot_id": "lot-a7-bc-pas-l1",
      "lot_ids": [
        "lot-a7-bc-pas-l1",
        "lot-a7-bc-pas-l2"
      ],
      "source": {
        "id": "digi24",
        "name": "Digi24",
        "trust_tier": 2
      },
      "co_citations": []
    },
    {
      "id": "sc-7fca3ab84713",
      "title": "VIDEO Umbrărescu a adus 1.000 de muncitori pe Autostrada Bacău - Pașcani",
      "extracted_headline": "UMB mobilizează muncitori și utilaje pe A7, tronsonul Bacău–Pașcani, pentru finalizare în 2026",
      "summary": "Constructorul UMB a mobilizat 1.000 de muncitori și 800 de utilaje pe tronsonul Bacău–Pașcani al Autostrăzii A7 pentru a finaliza lucrările în 2026.",
      "url": "https://www.profit.ro/povesti-cu-profit/auto-transporturi/video-umbrarescu-a-adus-1-000-de-muncitori-pe-autostrada-bacau-pascani-22978903",
      "published_at": "2026-11-10T13:36:00Z",
      "roads": [
        "A7"
      ],
      "lot_id": "lot-a7-bc-pas-l1",
      "lot_ids": [
        "lot-a7-bc-pas-l1",
        "lot-a7-bc-pas-l2"
      ],
      "source": {
        "id": "profit",
        "name": "Profit.ro",
        "trust_tier": 2
      },
      "co_citations": []
    },
    {
      "id": "sc-e8013d42bd32",
      "title": "VIDEO | Drumul Expres Brăila–Galați a ajuns la 98%. UMB a montat doar 32 din cele 204 dale prevăzute pe podul hobanat",
      "extracted_headline": "Drumul Expres Brăila–Galați la 98%: UMB a montat 32 din 204 dale pe podul hobanat",
      "summary": "Ministrul Transporturilor a declarat pe 10 noiembrie 2026 că Drumul Expres Brăila–Galați este realizat în proporție de 98%.",
      "url": "https://economedia.ro/video-drumul-expres-braila-galati-a-ajuns-la-98-umb-a-montat-doar-32-din-cele-204-dale-prevazute-pe-podul-hobanat.html",
      "published_at": "2026-11-10T13:01:58Z",
      "roads": [
        "DEx6",
        "A0",
        "A3",
        "A7",
        "A1"
      ],
      "lot_id": "lot-dex6",
      "lot_ids": [
        "lot-dex6"
      ],
      "source": {
        "id": "economedia",
        "name": "Economedia",
        "trust_tier": 2
      },
      "co_citations": [
        {
          "id": "art-e853822c014c",
          "source_name": "Economedia",
          "url": "https://economedia.ro/in-ce-stadiu-au-ajuns-autostrazile-pe-care-autoritatile-promit-ca-le-vor-deschide-pana-la-finalul-anului-cei-130-de-kilometri-anuntati-de-ministrul-transporturilor.html",
          "title": "În ce stadiu au ajuns autostrăzile pe care autoritățile promit că le vor deschide până la finalul anului. Cei 130 de…"
        }
      ]
    },
    {
      "id": "sc-19b033eea5f7",
      "title": "Autostrada Pașcani–Suceava, contracte de aproape 6 miliarde de lei cu UMB, dar fără finanțare. Cristian Pistol: Nu a…",
      "extracted_headline": "Contracte semnate cu UMB pentru A7 Pașcani–Suceava de aproape 6 mld. lei, dar fără finanțare sigură",
      "summary": "CNAIR a semnat la 30 aprilie 2026 două contracte de proiectare și execuție pentru Autostrada Pașcani–Suceava cu asocierea condusă de UMB, însă proiectarea nu a început din cauza lipsei unui titlu bugetar pentru finanțarea SAFE.",
      "url": "https://economedia.ro/autostrada-pascani-suceava-contracte-de-aproape-6-miliarde-de-lei-cu-umb-dar-fara-finantare-cristian-pistol-nu-a-putut-fi-emis-ordinul-de-incepere.html",
      "published_at": "2026-11-10T09:48:05Z",
      "roads": [
        "A7"
      ],
      "lot_id": "lot-a7-pas-sv-l1",
      "lot_ids": [
        "lot-a7-pas-sv-l1",
        "lot-a7-pas-sv-l2"
      ],
      "source": {
        "id": "economedia",
        "name": "Economedia",
        "trust_tier": 2
      },
      "co_citations": []
    },
    {
      "id": "sc-7caf1017cdb3",
      "title": "Alexandru Nazare, discuție cu Mark Rutte despre securitatea Mării Negre și finanțarea apărării. Ce rol va avea…",
      "extracted_headline": "Nazare: finanțare mutată în PNRR și 4,2 mld. euro prin SAFE pentru Autostrada Moldovei (A7)",
      "summary": "Ministrul Finanțelor Alexandru Nazare a declarat la reuniunea Eurogrup că finanțarea Autostrăzii Moldovei (A7) a fost transferată din componenta de împrumut în fonduri nerambursabile în PNRR și că s-au obținut 4,2 miliarde de euro prin…",
      "url": "https://www.mediafax.ro/politic/alexandru-nazare-discutie-cu-mark-rutte-despre-securitatea-marii-negre-si-finantarea-apararii-ce-rol-va-avea-autostrada-moldovei-23840526",
      "published_at": "2026-11-09T20:04:34Z",
      "roads": [
        "A7"
      ],
      "lot_id": null,
      "lot_ids": [],
      "source": {
        "id": "mediafax",
        "name": "Mediafax",
        "trust_tier": 2
      },
      "co_citations": [
        {
          "id": "art-33c2a7a840df",
          "source_name": "G4Media",
          "url": "https://www.g4media.ro/alexandru-nazare-discutie-cu-mark-rutte-la-reuniunea-eurogrup-despre-finantarea-militara-autostrada-moldovei-rolul-bancii-pentru-aparare-securitate-si-rezilienta-in-care-romania-participa-ca-stat.html",
          "title": "Alexandru Nazare, discuție cu Mark Rutte la reuniunea Eurogrup, despre finanțarea militară, Autostrada Moldovei, rolul…"
        }
      ]
    },
    {
      "id": "sc-0e5da1ca977a",
      "title": "EXCLUSIV: Radu Miruță îl contrazice pe ministrul Transporturilor în cazul tunelului Momaia: „Au tot întârziat ca să-i…",
      "extracted_headline": "Deschiderea secțiunii Tigveni–Curtea de Argeș (A1) amânată din lipsă de personal pentru tunelul Momaia",
      "summary": "Deschiderea circulației pe secțiunea Tigveni – Curtea de Argeș a autostrăzii A1 Sibiu–Pitești este amânată din cauza lipsei personalului specializat pentru operarea tunelului Momaia.",
      "url": "https://economedia.ro/radu-miruta-il-contrazice-pe-ministrul-transporturilor-in-cazul-tunelului-momaia-au-tot-intarziat-ca-sa-i-ofere-o-ofranda-noului-ministru.html",
      "published_at": "2026-11-09T15:02:28Z",
      "roads": [
        "A1",
        "A3",
        "A7",
        "A0",
        "A8",
        "DEx6"
      ],
      "lot_id": "lot-a1-pit-sb-s4",
      "lot_ids": [
        "lot-a1-pit-sb-s4"
      ],
      "source": {
        "id": "economedia",
        "name": "Economedia",
        "trust_tier": 2
      },
      "co_citations": [
        {
          "id": "art-90065250442f",
          "source_name": "Economedia",
          "url": "https://economedia.ro/document-radu-miruta-a-permis-ocuparea-posturilor-vacante-pentru-administrarea-infrastructurii.html",
          "title": "DOCUMENT: Radu Miruță afirmă că a permis ocuparea posturilor vacante pentru administrarea infrastructurii"
        },
        {
          "id": "art-8ba2a23da312",
          "source_name": "Adevărul",
          "url": "https://adevarul.ro/economie/se-amana-deschiderea-unui-tronson-din-autostrada-2570139.html",
          "title": "Dispută politică pe tema tunelului Momaia. Deschiderea unui tronson din Autostrada Sibiu–Pitești, amânată"
        },
        {
          "id": "art-6c89a6a48f54",
          "source_name": "Economedia",
          "url": "https://economedia.ro/tunelul-momaia-de-pe-a1-sibiu-pitesti-nu-se-mai-deschide-ministrul-transporturilor-il-acuza-pe-radu-miruta-ca-a-blocat-ordinul-necesar-ce-autostrazi-se-deschid-totusi-pana-la-final.html",
          "title": "Tunelul Momaia de pe A1 Sibiu–Pitești nu se poate deschide. Ministrul Transporturilor îl acuză pe Radu Miruță că a…"
        }
      ]
    },
    {
      "id": "sc-cd452bcb6193",
      "title": "Câți kilometri de autostrăzi și drumuri expres se vor mai deschide în acest an. Anunțul ministrului Transporturilor",
      "extracted_headline": "Deschiderea tunelului Curtea de Argeș – Tigveni amânată din lipsă de personal specializat",
      "summary": "Tunelul Momaia de pe secțiunea Curtea de Argeș – Tigveni (A1) nu poate fi deschis imediat după finalizarea lucrărilor deoarece nu există personal specializat pentru operare şi monitorizare.",
      "url": "https://www.mediafax.ro/economic/cati-kilometri-de-autostrazi-si-drumuri-expres-se-vor-mai-deschide-in-acest-an-anuntul-ministrului-transporturilor-23840279",
      "published_at": "2026-11-09T14:39:44Z",
      "roads": [
        "A0",
        "A3",
        "A7",
        "A1",
        "DEx6"
      ],
      "lot_id": "lot-a1-pit-sb-s4",
      "lot_ids": [
        "lot-a1-pit-sb-s4"
      ],
      "source": {
        "id": "mediafax",
        "name": "Mediafax",
        "trust_tier": 2
      },
      "co_citations": [
        {
          "id": "art-cf8e1c6b6536",
          "source_name": "Arena Construcțiilor",
          "url": "https://arenaconstruct.ro/deschiderea-tunelului-curtea-de-arges-intarziata-de-lipsa-personalului-specializat",
          "title": "Deschiderea tunelului de la Curtea de Arges, intarziata de lipsa personalului specializat"
        },
        {
          "id": "art-c267b50031b8",
          "source_name": "Economica.net",
          "url": "https://www.economica.net/primul-tunel-de-autostrada-3_993558.html",
          "title": "Primul tunel veritabil de autostradă din România mai așteaptă până la inaugurare, deși e gata. Trebuie angajat…"
        }
      ]
    },
    {
      "id": "sc-65a478442770",
      "title": "Ministrul Transporturilor: „138 km de autostradă și drum expres ar putea fi deschiși până la finalul anului”",
      "extracted_headline": "Ministrul: 138 km de autostradă și drum expres ar putea fi deschiși până la sfârșitul anului",
      "summary": "Ministrul Transporturilor a afirmat că alte 138 km de autostradă și drum expres ar putea fi deschiși până la sfârșitul anului, vizând tronsoane pe A0, A1, A3, A7 și Drumul Expres Brăila–Galați.",
      "url": "https://www.digi24.ro/stiri/economie/transporturi/ministrul-transporturilor-138-km-de-autostrada-si-drum-expres-ar-putea-fi-deschisi-pana-la-finalul-anului-4028249",
      "published_at": "2026-11-09T14:29:00Z",
      "roads": [
        "A0",
        "A1",
        "A3",
        "A7",
        "DEx6"
      ],
      "lot_id": "lot-a0-nord-l1",
      "lot_ids": [
        "lot-a0-nord-l1",
        "lot-a3-nad-zimbor",
        "lot-a3-suplacu-chiribis",
        "lot-a7-bc-pas-l1",
        "lot-a7-bc-pas-l2",
        "lot-dex6"
      ],
      "source": {
        "id": "digi24",
        "name": "Digi24",
        "trust_tier": 2
      },
      "co_citations": []
    },
    {
      "id": "sc-1e88137d7387",
      "title": "România ar putea sparge în 2026 recordul la kilometri noi de autostradă. Lotul de care depinde depășirea pragului din…",
      "extracted_headline": "România mizează pe deschideri înainte de finalul anului pentru a bate recordul din 2024",
      "summary": "Oficialii anunță deschideri planificate până la finalul anului pentru mai multe loturi de pe A0, A1, A3, A7 și drumul expres Brăila–Galați.",
      "url": "https://www.economica.net/romania-kilometri-autostrada-2_993603.html",
      "published_at": "2026-11-09T14:23:18Z",
      "roads": [
        "A0",
        "A1",
        "A3",
        "A7",
        "DEx6"
      ],
      "lot_id": "lot-a0-nord-l1",
      "lot_ids": [
        "lot-a0-nord-l1",
        "lot-a1-pit-sb-s4",
        "lot-a3-nad-zimbor",
        "lot-a3-suplacu-chiribis",
        "lot-dex6"
      ],
      "source": {
        "id": "economica",
        "name": "Economica.net",
        "trust_tier": 2
      },
      "co_citations": []
    },
    {
      "id": "sc-1365795488a9",
      "title": "Drumul Expres Suceava – Siret, Lotul 3: Rezultatul licitatiei a fost anulat de Curtea de Apel",
      "extracted_headline": "Curtea de Apel anulează raportul de atribuire pentru Lotul 3 Suceava–Siret (A7)",
      "summary": "Curtea de Apel a anulat raportul procedurii de achiziție din aprilie 2026 pentru atribuirea contractului de proiectare și execuție a Lotului 3 Bălcăuți–Siret și a dispus reevaluarea a trei oferte.",
      "url": "https://arenaconstruct.ro/drumul-expres-suceava-siret-lotul-3-rezultatul-licitatiei-a-fost-anulat-de-curtea-de-apel",
      "published_at": "2026-11-04T11:24:29Z",
      "roads": [
        "A7"
      ],
      "lot_id": "lot-a7-sv-sir-l3",
      "lot_ids": [
        "lot-a7-sv-sir-l3"
      ],
      "source": {
        "id": "arenaconstruct",
        "name": "Arena Construcțiilor",
        "trust_tier": 2
      },
      "co_citations": []
    },
    {
      "id": "sc-4699b791d1bc",
      "title": "Autostrada A7 Bacău - Pașcani: Umbrărescu se apropie de 80% cu lucrările la lotul 1 - Economica.net",
      "extracted_headline": "Lucrări la nodurile rutiere pe Lotul 1 Săucești–Trifești din A7; stadiul fizic 77%",
      "summary": "Pe Lotul 1 Săucești–Trifești al Autostrăzii A7 Bacău–Pașcani se lucrează la amenajarea nodurilor rutiere, iar stadiul fizic de execuție este de 77% conform DRDP Iași.",
      "url": "https://www.economica.net/autostrada-a7-bacau-pascani-21_991950.html",
      "published_at": "2026-11-03T15:55:14Z",
      "roads": [
        "A7"
      ],
      "lot_id": "lot-a7-bc-pas-l1",
      "lot_ids": [
        "lot-a7-bc-pas-l1"
      ],
      "source": {
        "id": "economica",
        "name": "Economica.net",
        "trust_tier": 2
      },
      "co_citations": [
        {
          "id": "art-db2b64b6b9e2",
          "source_name": "Economica.net",
          "url": "https://www.economica.net/autostrada-moldovei-a7-79_992941.html",
          "title": "VIDEO Autostrada Moldovei A7: UMB așterne asfalt în apropiere de nodul rutier Roman Sud - Economica.net"
        }
      ]
    },
    {
      "id": "sc-c4a99f13abbc",
      "title": "Veste bună pentru șoferi! Miercuri vor fi dați în circulație încă 13 kilometri din Autostrada Bucureștiului",
      "extracted_headline": "Se deschid 13 km din A0 Nord între Afumați și Glina pe 4 noiembrie 2026",
      "summary": "Ministerul Transporturilor anunță deschiderea spre trafic a 13 kilometri din A0 Nord, între Afumați și Glina, pe 4 noiembrie 2026.",
      "url": "https://www.mediafax.ro/economic/veste-buna-pentru-soferi-miercuri-vor-fi-dati-in-circulatie-inca-13-kilometri-din-autostrada-bucurestiului-23836720",
      "published_at": "2026-11-03T12:23:47Z",
      "roads": [
        "A0",
        "A1",
        "A3",
        "A7",
        "DEx6"
      ],
      "lot_id": "lot-a0-nord-l3",
      "lot_ids": [
        "lot-a0-nord-l1",
        "lot-a0-nord-l3",
        "lot-a0-nord-l4"
      ],
      "source": {
        "id": "mediafax",
        "name": "Mediafax",
        "trust_tier": 2
      },
      "co_citations": [
        {
          "id": "art-8f4fcca85f68",
          "source_name": "HotNews",
          "url": "https://hotnews.ro/cati-kilometri-de-autostrada-are-romania-acum-dupa-inagurarea-de-pe-centura-capitalei-a0-ce-alte-loturi-au-sanse-sa-mai-fie-deschise-in-acest-an-2394705",
          "title": "Câți kilometri de autostradă are România acum, după inaugurarea de pe Centura Capitalei A0. Ce alte loturi au șanse să…"
        },
        {
          "id": "art-64a4298f8246",
          "source_name": "Economedia",
          "url": "https://economedia.ro/autostrada-a0-scurteaza-drumul-ploiesti-constanta.html",
          "title": "Autostrada A0 scurtează drumul Ploiești–Constanța cu aproape 40 de minute. Șoferii pot evita Centura Bucureștiului și…"
        },
        {
          "id": "art-1e0ae5e7a5f2",
          "source_name": "HotNews",
          "url": "https://hotnews.ro/s-a-deschis-circulatia-pe-autostrada-de-centura-a-capitalei-a0-pe-primul-si-singurul-lot-construit-de-chinezi-in-romania-2394838",
          "title": "S-a deschis circulația pe Autostrada de Centură a Capitalei A0, pe primul și singurul lot construit de chinezi în…"
        },
        {
          "id": "art-783365e73540",
          "source_name": "Mediafax",
          "url": "https://www.mediafax.ro/politic/doua-noi-loturi-din-a0-inaugurate-miercuri-grindeanu-inca-13-kilometri-pe-sectiunea-afumati-glina-au-fost-deschisi-23837451",
          "title": "Două noi loturi din A0, inaugurate miercuri. Grindeanu: Încă 13 kilometri, pe secțiunea Afumați-Glina, au fost deschiși"
        },
        {
          "id": "art-382a11a4b267",
          "source_name": "Economedia",
          "url": "https://economedia.ro/video-autostrada-a0-nord-s-a-deschis-circulatia-pe-loturile-3-si-4-cei-13-kilometri-dintre-afumati-si-glina-asigura-legatura-directa-intre-a3-si-a2.html",
          "title": "VIDEO | Autostrada A0 Nord: S-a deschis circulația pe loturile 3 și 4. Cei 13 kilometri dintre Afumați și Glina…"
        },
        {
          "id": "art-193b3189fe1a",
          "source_name": "Profit.ro",
          "url": "https://www.profit.ro/povesti-cu-profit/auto-transporturi/video-foto-a-fost-deschis-tronsonul-de-autostrada-amanat-cu-scandal-22938563",
          "title": "VIDEO&FOTO A fost deschis tronsonul de autostradă amânat cu scandal"
        },
        {
          "id": "art-2fb1aefd97ba",
          "source_name": "Asociația Pro Infrastructură",
          "url": "https://proinfrastructura.ro/luari-de-pozitie/de-maine-avem-a0-fara-intrerupere-intre-dn1-otopeni-si-a2-cernica",
          "title": "De mâine, avem A0 fără întrerupere între DN1 (Otopeni) și A2 (Cernica)"
        },
        {
          "id": "art-ac73b9a4a95a",
          "source_name": "Economedia",
          "url": "https://economedia.ro/autostrada-a0-va-asigura-circulatia-fara-intrerupere-intre-dn1-si-a2-de-miercuri-se-deschid-13-kilometri-din-nordul-capitalei-cu-intarzieri-de-pana-la-noua-luni.html",
          "title": "Autostrada A0 va asigura circulația fără întrerupere între DN1 și A2, de miercuri. Se deschid 13 kilometri din nordul…"
        },
        {
          "id": "art-bd21593802fe",
          "source_name": "G4Media",
          "url": "https://www.g4media.ro/miercuri-se-deschide-un-nou-lot-pe-a0-nord-13-kilometri-in-plus-intre-afumati-si-glina.html",
          "title": "Miercuri se deschide un nou lot pe A0 Nord / 13 kilometri în plus, între Afumați și Glina"
        },
        {
          "id": "art-ae019ebf5f33",
          "source_name": "Digi24",
          "url": "https://www.digi24.ro/stiri/economie/transporturi/inca-doua-loturi-din-autostrada-de-centura-a-bucurestiului-urmeaza-sa-se-deschida-soferii-vor-putea-ajunge-direct-de-pe-a3-pe-a2-4019927",
          "title": "Încă două loturi din autostrada de centură a Bucureștiului urmează să se deschidă. Șoferii vor putea ajunge direct de…"
        },
        {
          "id": "art-93e98c580779",
          "source_name": "HotNews",
          "url": "https://hotnews.ro/video-se-deschide-traficul-pe-autostrada-de-centura-a-capitalei-pe-tronsonul-amanat-cu-scandal-anuntul-ministrului-transporturilor-2393538",
          "title": "VIDEO Se deschide traficul pe Autostrada de Centură a Capitalei, pe tronsonul amânat cu scandal. Anunțul ministrului…"
        },
        {
          "id": "art-366b63e09731",
          "source_name": "Profit.ro",
          "url": "https://www.profit.ro/povesti-cu-profit/auto-transporturi/video-foto-anunt-tronsonul-de-autostrada-amanat-cu-scandal-va-fi-deschis-maine-22931224",
          "title": "VIDEO&FOTO ANUNȚ Tronsonul de autostradă amânat cu scandal va fi deschis mâine"
        },
        {
          "id": "art-1dcddb84ec3e",
          "source_name": "Adevărul",
          "url": "https://adevarul.ro/economie/inca-13-kilometri-din-autostrada-bucurestiului-se-2568612.html",
          "title": "Încă 13 kilometri din Autostrada Bucureștiului se deschid miercuri. Legătură directă între A2 și A3"
        },
        {
          "id": "art-05df43395d09",
          "source_name": "Economedia",
          "url": "https://economedia.ro/autostrada-a0-nord-este-gata-intre-afumati-si-glina-deschiderea-oficiala-miercuri-4-noiembrie-inaugurarea-promisa-pe-26-octombrie-a-fost-ratata.html",
          "title": "VIDEO | Autostrada A0 Nord este gata între Afumați și Glina. Deschiderea oficială, miercuri, 4 noiembrie, de la ora…"
        }
      ]
    },
    {
      "id": "sc-55dbb4950a2a",
      "title": "Autostrada A7 Bacau – Pascani: Pe lotul 1 Saucesti – Trifesti se lucreaza la nodurile rutiere",
      "extracted_headline": "Lotul 1 Săucești–Trifești (A7) are 77% execuție; se lucrează la noduri rutiere",
      "summary": "Pe Lotul 1 Săucești – Trifești al Autostrăzii A7 Bacău – Pașcani se lucrează la amenajarea nodurilor rutiere, stadiul fizic fiind de 77% conform DRDP Iași.",
      "url": "https://arenaconstruct.ro/autostrada-a7-bacau-pascani-pe-lotul-1-saucesti-trifesti-se-lucreaza-la-nodurile-rutiere",
      "published_at": "2026-11-03T11:22:09Z",
      "roads": [
        "A7"
      ],
      "lot_id": "lot-a7-bc-pas-l1",
      "lot_ids": [
        "lot-a7-bc-pas-l1",
        "lot-a7-bc-pas-l2",
        "lot-a7-bc-pas-l3"
      ],
      "source": {
        "id": "arenaconstruct",
        "name": "Arena Construcțiilor",
        "trust_tier": 2
      },
      "co_citations": []
    },
    {
      "id": "sc-c15732c4d657",
      "title": "Top constructori autostrăzi: Makyol, Danlin XXL și Pizzarotti - Retter au avut cele mai mari progese în ultimele două…",
      "extracted_headline": "Progrese semnificative pe A13, A0, A3, A1 și A7; loturi A13 ajung peste 40% fizic",
      "summary": "Articolul raportează progrese fizice recente pe mai multe loturi de autostradă din România, cele mai mari fiind pe loturi din A13, A8 și A0.",
      "url": "https://www.economica.net/top-constructori-autostrazi-25_990095.html",
      "published_at": "2026-11-01T16:40:44Z",
      "roads": [
        "A13",
        "A8",
        "A0",
        "A3",
        "A1",
        "A7"
      ],
      "lot_id": "lot-a13-l4",
      "lot_ids": [
        "lot-a1-pit-sb-s3",
        "lot-a1-pit-sb-s4",
        "lot-a13-l1",
        "lot-a13-l2",
        "lot-a13-l4"
      ],
      "source": {
        "id": "economica",
        "name": "Economica.net",
        "trust_tier": 2
      },
      "co_citations": []
    },
    {
      "id": "sc-96bf997272c9",
      "title": "Autostrada Moldovei: Umbrărescu își retrage \"trupele\" din Ardeal și vrea să termine în 2026 lucrările la A7 Bacău…",
      "extracted_headline": "A7: posibilă deschidere până la limita județului Iași la finalul anului 2026",
      "summary": "CNAIR estimează darea în folosință a unor sectoare A7 până la sfârșitul anului 2026, iar continuarea până la Pașcani e estimată pentru începutul lui 2027.",
      "url": "https://www.economica.net/autostrada-moldovei-umbrarescu_990805.html",
      "published_at": "2026-10-31T07:00:51Z",
      "roads": [
        "A7"
      ],
      "lot_id": "lot-a7-bc-pas-l1",
      "lot_ids": [
        "lot-a7-bc-pas-l1"
      ],
      "source": {
        "id": "economica",
        "name": "Economica.net",
        "trust_tier": 2
      },
      "co_citations": []
    },
    {
      "id": "sc-85f760f1f07a",
      "title": "Autostrada A7: Încă două benzinării vor fi amenajate. Unde apar primele parcări securizate pentru camioane",
      "extracted_headline": "Două noi benzinării și primele parcări securizate pentru camioane pe autostrada A7",
      "summary": "Pe autostrada A7, la km 131 în zona Milcovul, vor fi amenajate două spații de servicii cu parcări securizate pentru camioane.",
      "url": "https://economedia.ro/autostrada-a7-inca-doua-benzinarii-vor-fi-amenajate-unde-apar-primele-parcari-securizate-pentru-camioane.html",
      "published_at": "2026-10-30T08:54:02Z",
      "roads": [
        "A7"
      ],
      "lot_id": null,
      "lot_ids": [],
      "source": {
        "id": "economedia",
        "name": "Economedia",
        "trust_tier": 2
      },
      "co_citations": [
        {
          "id": "art-749a20d7f810",
          "source_name": "Economedia",
          "url": "https://economedia.ro/30-de-puncte-de-incarcare-electrica-inclusiv-pentru-camioane-vor-fi-instalate-pe-a7-la-milcovul.html",
          "title": "30 de puncte de încărcare electrică, inclusiv pentru camioane, vor fi instalate pe A7, la Milcovul"
        }
      ]
    },
    {
      "id": "sc-2329ec411280",
      "title": "UPDATE: NU se deschid astăzi cei 13 km din Autostrada Bucureștiului A0 Nord, între Afumați, Pantelimon și A2 / CNAIR…",
      "extracted_headline": "Loturile 3 și 4 ale A0 Nord nu se deschid în octombrie, deschiderea amânată până la sfârșitul lui 2026",
      "summary": "Consiliul Județean Ilfov a anunțat că deschiderea loturilor 3 și 4 ale autostrăzii A0 Nord este amânată până la sfârșitul anului 2026, fără o dată confirmată de CNAIR.",
      "url": "https://economedia.ro/se-deschid-astazi-inca-13-km-din-autostrada-bucurestiului-a0-nord-intre-afumati-pantelimon-si-a2-lotul-3-intarziat-cu-un-an-va-permite-circulatia-continua-intre-a1-a2-si-a3-precum-si-dn1.html",
      "published_at": "2026-10-26T05:00:32Z",
      "roads": [
        "A0",
        "A3",
        "A7",
        "DEx6",
        "A1"
      ],
      "lot_id": "lot-a0-nord-l3",
      "lot_ids": [
        "lot-a0-nord-l3",
        "lot-a0-nord-l4"
      ],
      "source": {
        "id": "economedia",
        "name": "Economedia",
        "trust_tier": 2
      },
      "co_citations": [
        {
          "id": "art-e30ff85c1cb1",
          "source_name": "Arena Construcțiilor",
          "url": "https://arenaconstruct.ro/ce-tronsoane-de-drum-de-mare-viteza-vor-fi-deschise-pana-la-finalul-anului-de-cnair",
          "title": "Ce tronsoane de drum de mare viteza vor fi deschise pana la finalul anului de CNAIR – ARENA Constructiilor – stiri din…"
        },
        {
          "id": "art-920c15e6763f",
          "source_name": "Digi24",
          "url": "https://www.digi24.ro/stiri/economie/transporturi/circulatia-pe-a0-nord-amanata-spre-finalul-anului-un-fost-oficial-din-min-transporturilor-anuntase-ca-inaugurarea-va-avea-loc-luni-4009681",
          "title": "Circulaţia pe A0 Nord, amânată spre finalul anului. Un fost oficial din Min. Transporturilor anunţase că inaugurarea…"
        },
        {
          "id": "art-1f51cba79892",
          "source_name": "Adevărul",
          "url": "https://adevarul.ro/politica/horatiu-cosma-il-acuza-pe-seful-psd-ca-a-amanat-2566659.html",
          "title": "Horațiu Cosma îl acuză pe șeful PSD că a amânat deschiderea A0 Nord: „Pistol, la ordinul lui Grindeanu, le-a ordonat…"
        },
        {
          "id": "art-2cf6176ebbde",
          "source_name": "Economedia",
          "url": "https://economedia.ro/horatiu-cosma-acuza-o-amanare-politica-a-deschiderii-loturilor-3-si-4-ale-a0-nord-grindeanu-si-pistol-au-spus-nu.html",
          "title": "Horațiu Cosma acuză o amânare politică a deschiderii loturilor 3 și 4 ale A0 Nord: „Grindeanu și Pistol au spus NU”"
        },
        {
          "id": "art-f07cd40ae6e1",
          "source_name": "Economedia",
          "url": "https://economedia.ro/loturile-3-si-4-ale-a0-nord-ar-urma-sa-fie-deschise-pana-la-sfarsitul-anului-anunta-cj-ilfov-cnair-nu-confirma-inca-un-termen.html",
          "title": "Loturile 3 și 4 ale A0 Nord ar urma să fie deschise până la sfârșitul anului, anunță CJ Ilfov. CNAIR nu confirmă încă…"
        }
      ]
    },
    {
      "id": "sc-d8c165f62874",
      "title": "Autostrada A7 Bacău – Pașcani: stadiul lucrărilor pe loturi",
      "extracted_headline": "Stadiul lucrărilor la autostrada A7 Bacău‑Pașcani: progres, termene și contracte pe cele trei loturi",
      "summary": "Lucrările la autostrada A7 Bacău‑Pașcani avansează, cu progres fizic între 55,70% și 71,70% pe cele trei loturi.",
      "url": "https://economedia.ro/autostrada-a7-bacau-pascani-stadiul-a-ajuns-la-717-pe-primul-lot-lotul-2-are-termenul-de-finalizare-depasit.html",
      "published_at": "2026-10-23T17:30:57Z",
      "roads": [
        "A7"
      ],
      "lot_id": "lot-a7-bc-pas-l2",
      "lot_ids": [
        "lot-a7-bc-pas-l1",
        "lot-a7-bc-pas-l2",
        "lot-a7-bc-pas-l3"
      ],
      "source": {
        "id": "economedia",
        "name": "Economedia",
        "trust_tier": 2
      },
      "co_citations": []
    },
    {
      "id": "sc-e7631e4244f7",
      "title": "EXCLUSIV | CNAIR pierde procesul cu bulgarii pentru penalități de 43 mil. lei",
      "extracted_headline": "Dispută juridică pentru Lotul 2 A7 Mizil–Pietroasele: penalități de 43 mil. lei și arbitraj în curs",
      "summary": "Curtea de Apel București a respins, pe 16 octombrie 2026, acțiunea CNAIR privind anularea unei măsuri arbitrale legate de penalități de 43 mil. lei pentru Lotul 2 Mizil–Pietroasele al A7.",
      "url": "https://economedia.ro/exclusiv-cnair-pierde-procesul-pentru-penalitati-de-43-mil-lei.html",
      "published_at": "2026-10-16T17:22:31Z",
      "roads": [
        "A7"
      ],
      "lot_id": "lot-a7-pl-bz-l2",
      "lot_ids": [
        "lot-a7-pl-bz-l2"
      ],
      "source": {
        "id": "economedia",
        "name": "Economedia",
        "trust_tier": 2
      },
      "co_citations": [
        {
          "id": "art-bc81fc84d154",
          "source_name": "Economedia",
          "url": "https://economedia.ro/cnair-transmite-ca-nu-a-pierdut-dreptul-la-penalitatile-de-43-milioane-de-lei-pentru-lotul-2-al-a7-plata-este-amanata-pana-la-finalul-arbitrajului.html",
          "title": "CNAIR transmite că nu a pierdut dreptul la penalitățile de 43 milioane de lei pentru lotul 2 al A7"
        }
      ]
    },
    {
      "id": "sc-1580e3fe7070",
      "title": "Finalizarea proiectului „Elaborare Studiu de Fezabilitate pentru obiectivul de investiții &lt;&lt;Drumorbital…",
      "extracted_headline": "Finalizat studiul de fezabilitate pentru drumul orbital Buzău – legătura cu Autostrada A7",
      "summary": "Ministerul Transporturilor și Infrastructurii și CNAIR au semnat contractul de finanțare pentru studiul de fezabilitate al drumului orbital ce va conecta Buzău cu Autostrada A7.",
      "url": "https://www.cnadnr.ro/ro/comunicare/comunicate-de-presa/interes-general/finalizarea-proiectului-%E2%80%9Eelaborare-studiu-de",
      "published_at": "2026-08-25T12:00:00Z",
      "roads": [
        "A7"
      ],
      "lot_id": null,
      "lot_ids": [],
      "source": {
        "id": "cnair",
        "name": "CNAIR Comunicate de Presă",
        "trust_tier": 1
      },
      "co_citations": []
    },
    {
      "id": "sc-3fd849450db6",
      "title": "Contestațiile depuse la licitația pentru pentru construirea tronsonului Suceava - Siret al Autostrăzii Moldovei…",
      "extracted_headline": "Contestațiile la licitația pentru tronsonul Suceava–Siret (A7) au fost respinse; același constructor pentru ambele lo...",
      "summary": "Consiliul Naţional de Soluţionare a Contestaţiilor a respins cele opt contestaţii depuse la licitaţia pentru tronsonul Suceava - Siret al Autostrăzii Moldovei (A7), păstrându-se câştigătorul desemnat.",
      "url": "https://www.digi24.ro/stiri/economie/transporturi/contestatiile-depuse-la-licitatia-pentru-pentru-construirea-tronsonului-suceava-siret-al-autostrazii-moldovei-proiect-safe-respinse-3786925",
      "published_at": "2026-05-26T19:29:14Z",
      "roads": [
        "A7"
      ],
      "lot_id": "lot-a7-sv-sir-l1",
      "lot_ids": [
        "lot-a7-sv-sir-l1",
        "lot-a7-sv-sir-l2"
      ],
      "source": {
        "id": "digi24",
        "name": "Digi24",
        "trust_tier": 2
      },
      "co_citations": []
    },
    {
      "id": "sc-c09017ab6b48",
      "title": "CNAIR a semnat contractele pentru proiectarea și construcția autostrăzii Pașcani – Suceava!",
      "extracted_headline": "CNAIR a semnat contractele pentru proiectarea și execuția autostrăzii Pașcani‑Suceava",
      "summary": "CNAIR a încheiat două contracte de proiectare și execuție pentru autostrada Pașcani‑Suceava, loturile 1 și 2, cu un consorțiu format din CONSTRUCT, UMB și TEHNOSTRADE.",
      "url": "https://www.cnadnr.ro/ro/comunicare/comunicate-de-presa/interes-general/cnair-semnat-contractele-pentru-proiectarea-%C8%99i",
      "published_at": "2026-05-01T12:00:00Z",
      "roads": [
        "A7"
      ],
      "lot_id": "lot-a7-pas-sv-l1",
      "lot_ids": [
        "lot-a7-pas-sv-l1",
        "lot-a7-pl-bz-l1",
        "lot-a7-pl-bz-l2"
      ],
      "source": {
        "id": "cnair",
        "name": "CNAIR Comunicate de Presă",
        "trust_tier": 1
      },
      "co_citations": []
    },
    {
      "id": "sc-0b9af1d037af",
      "title": "Câștigător-surpriză pe două tronsoane din autostrada „Moldovei”. Cine va face drumul până aproape de granița cu…",
      "extracted_headline": "Asocierea Far Foundation va construi loturile 1 și 2 ale drumului expres Suceava–Siret; pregătiri pentru stație mobil...",
      "summary": "Consorțiul condus de Far Foundation (cu AUTOMAGISTRAL PIVDEN și LINCOR TRANS) a fost confirmat ca executant pentru Lotul 1 și Lotul 2 ale drumului expres Suceava–Siret, după respingerea celor opt contestații.",
      "url": "https://hotnews.ro/castigator-surpriza-pe-doua-tronsoane-din-autostrada-moldovei-cel-mai-mare-constructor-din-ucraina-va-face-drumul-pana-aproape-de-granita-2213017",
      "published_at": "2026-04-07T13:24:28Z",
      "roads": [
        "A7"
      ],
      "lot_id": "lot-a7-sv-sir-l1",
      "lot_ids": [
        "lot-a7-sv-sir-l1",
        "lot-a7-sv-sir-l2"
      ],
      "source": {
        "id": "hotnews",
        "name": "HotNews",
        "trust_tier": 2
      },
      "co_citations": [
        {
          "id": "art-1e2c86992193",
          "source_name": "Profit.ro",
          "url": "https://www.profit.ro/povesti-cu-profit/auto-transporturi/nou-drum-expres-in-romania-dupa-ce-au-fost-respinse-toate-contestatiile-apar-primele-pregatiri-pentru-viitorul-santier-al-drumului-expres-suceava-siret-22732748",
          "title": "Nou drum expres în România, după ce au fost respinse toate contestațiile. Apar primele pregătiri pentru viitorul…"
        }
      ]
    },
    {
      "id": "sc-efc889b53515",
      "title": "Elaborare Studiu de Fezabilitate pentru obiectivul de investiții Drum orbital - Legătura A7 – Buzău (tronsoanele 2, 3…",
      "extracted_headline": "Studiu de fezabilitate pentru drumul orbital A7 – Buzău, contract de finanțare nr. 94/2025",
      "summary": "Ministerul Transporturilor și Infrastructurii și CNAIR au semnat contractul de finanțare nr. 94/2025 pentru elaborarea studiului de fezabilitate al drumului orbital A7 – Buzău (tronsoane 2, 3 și 4).",
      "url": "https://www.cnadnr.ro/ro/comunicare/comunicate-de-presa/interes-general/elaborare-studiu-de-fezabilitate-pentru-obiectivul-6",
      "published_at": "2025-09-08T12:00:00Z",
      "roads": [
        "A7"
      ],
      "lot_id": null,
      "lot_ids": [],
      "source": {
        "id": "cnair",
        "name": "CNAIR Comunicate de Presă",
        "trust_tier": 1
      },
      "co_citations": []
    },
    {
      "id": "sc-568e7104a869",
      "title": "Autostrada A7 Pașcani - Suceava: De ce nu se semnează contractele cu UMB, deși au trecut mai bine de trei luni de când…",
      "extracted_headline": "Contractele pentru A7 Pașcani–Suceava: UMB desemnat câștigător, semnarea blocată de lipsa formularului F29",
      "summary": "CNAIR spune că Ministerul Finanțelor nu a transmis formularul F29 necesar semnării celor două contracte pentru A7 Pașcani–Suceava.",
      "url": "https://www.economica.net/autostrada-a7-pascani-suceava-8_856596.html",
      "published_at": "2025-07-22T08:47:00Z",
      "roads": [
        "A7"
      ],
      "lot_id": "lot-a7-pas-sv-l2",
      "lot_ids": [
        "lot-a7-pas-sv-l1",
        "lot-a7-pas-sv-l2"
      ],
      "source": {
        "id": "economica",
        "name": "Economica.net",
        "trust_tier": 2
      },
      "co_citations": [
        {
          "id": "art-c5f5e7d821c6",
          "source_name": "Economica.net",
          "url": "https://www.economica.net/autostrada-a7-pascani-suceava-9_936945.html",
          "title": "Autostrada A7 Pașcani - Suceava: E oficial! Contractele cu Umbrărescu vor fi semnate vineri Update - Economica.net"
        },
        {
          "id": "art-5188f7646e7e",
          "source_name": "Economica.net",
          "url": "https://www.economica.net/autostrada-a7-pascani-suceava-7_827715.html",
          "title": "Autostrada A7 Pașcani - Suceava: Umbrărescu, desemnat câștigător și pe lotul 2 - Economica.net"
        }
      ]
    },
    {
      "id": "sc-5055a1b6bfa0",
      "title": "Termenele de depunere a ofertelor pentru proiectarea și execuția unor loturi ale drumurilor de mare viteză dintre…",
      "extracted_headline": "Termene de depunere a ofertelor pentru loturile Autostrăzii Craiova‑Filiași și Drumului Expres Filiași‑Târgu Jiu",
      "summary": "CNAIR a publicat anunțurile de participare pentru loturile 1‑4 ale proiectului Autostrada Craiova‑Filiași și Drum Expres Filiași‑Târgu Jiu, stabilind termenele de depunere a ofertelor.",
      "url": "https://www.cnadnr.ro/ro/comunicare/comunicate-de-presa/interes-general/termenele-de-depunere-ofertelor-pentru-proiectarea-%C8%99i",
      "published_at": "2024-08-19T12:00:00Z",
      "roads": [
        "A6"
      ],
      "lot_id": "lot-a7-bz-foc-l4",
      "lot_ids": [
        "lot-a7-bz-foc-l4",
        "lot-a7-pl-bz-l1",
        "lot-a7-pl-bz-l2",
        "lot-a7-pl-bz-l3"
      ],
      "source": {
        "id": "cnair",
        "name": "CNAIR Comunicate de Presă",
        "trust_tier": 1
      },
      "co_citations": []
    },
    {
      "id": "sc-ebc18b1d03cb",
      "title": "CNAIR a publicat în SEAP licitația pentru proiectarea și construcția lotului 2 al autostrăzii Pașcani – Suceava!",
      "extracted_headline": "CNAIR lansează licitația pentru proiectarea și execuția lotului 2 al autostrăzii Pașcani – Suceava",
      "summary": "CNAIR a publicat în SEAP anunțul de participare pentru proiectarea și execuția lotului 2 al autostrăzii Pașcani‑Suceava, cu termen de depunere a ofertelor până la 30 septembrie 2024.",
      "url": "https://www.cnadnr.ro/ro/comunicare/comunicate-de-presa/interes-general/cnair-publicat-%C3%AEn-seap-licita%C8%9Bia-pentru-proiectarea",
      "published_at": "2024-08-14T12:00:00Z",
      "roads": [
        "A7"
      ],
      "lot_id": "lot-a7-pas-sv-l2",
      "lot_ids": [
        "lot-a7-pas-sv-l2"
      ],
      "source": {
        "id": "cnair",
        "name": "CNAIR Comunicate de Presă",
        "trust_tier": 1
      },
      "co_citations": []
    },
    {
      "id": "sc-632e2eb2ed90",
      "title": "CNAIR a transmis către ANAP documentația pentru lansarea procedurii de achiziție publică pentru proiectarea și…",
      "extracted_headline": "CNAIR trimite documentația pentru lansarea licitației la Lotul 2 al Autostrăzii Pașcani – Suceava",
      "summary": "CNAIR a transmis documentația de atribuire pentru lansarea procedurii de achiziție publică la Lotul 2 al Autostrăzii Pașcani – Suceava, care are o lungime de 28,97 km. Proiectul include poduri, pasaje și facilități de servicii, iar…",
      "url": "https://www.cnadnr.ro/ro/comunicare/comunicate-de-presa/interes-general/cnair-transmis-c%C4%83tre-anap-documenta%C8%9Bia-pentru-1",
      "published_at": "2024-07-15T12:00:00Z",
      "roads": [
        "A7"
      ],
      "lot_id": "lot-a7-pas-sv-l2",
      "lot_ids": [
        "lot-a7-pas-sv-l2"
      ],
      "source": {
        "id": "cnair",
        "name": "CNAIR Comunicate de Presă",
        "trust_tier": 1
      },
      "co_citations": []
    },
    {
      "id": "sc-79a6a1340b5c",
      "title": "CNAIR a desemnat câștigătorul licitației pentru contractul de Elaborare SF Noduri rutiere privind conectivitatea la…",
      "extracted_headline": "CNAIR desemnează câștigătorul licitației pentru studiul de fezabilitate nodurilor rutiere la A7, A2 și A0",
      "summary": "CNAIR a atribuit contractul de elaborare a studiului de fezabilitate pentru nodurile rutiere la A7, A2 și A0.",
      "url": "https://www.cnadnr.ro/ro/comunicare/comunicate-de-presa/interes-general/cnair-desemnat-c%C3%A2%C8%99tig%C4%83torul-licita%C8%9Biei-pentru-6",
      "published_at": "2024-06-04T12:00:00Z",
      "roads": [
        "A7",
        "A2",
        "A0"
      ],
      "lot_id": null,
      "lot_ids": [],
      "source": {
        "id": "cnair",
        "name": "CNAIR Comunicate de Presă",
        "trust_tier": 1
      },
      "co_citations": []
    },
    {
      "id": "sc-32c936c4f4cf",
      "title": "Elaborare Studiu de Fezabilitate pentru obiectivul de investitii &lt;&lt;Drum orbital - Legătura A7 – Buzău…",
      "extracted_headline": "Studiu de fezabilitate pentru legătura orbitală A7-Buzău (tronsoane 2-4)",
      "summary": "CNAIR a depus cererea de finanțare pentru studiul de fezabilitate al legăturii orbitală A7 – Buzău, tronsoanele 2, 3 și 4.",
      "url": "https://www.cnadnr.ro/ro/comunicare/comunicate-de-presa/interes-general/elaborare-studiu-de-fezabilitate-pentru-obiectivul-3",
      "published_at": "2024-03-27T12:00:00Z",
      "roads": [
        "A7"
      ],
      "lot_id": null,
      "lot_ids": [],
      "source": {
        "id": "cnair",
        "name": "CNAIR Comunicate de Presă",
        "trust_tier": 1
      },
      "co_citations": []
    }
  ],
  "milestones": [
    {
      "lot_id": "lot-a7-pl-bz-l1",
      "lot_name": "Lotul 1: Dumbrava – Mizil",
      "type": "open",
      "label": "Dat în trafic",
      "date": "2024-12-23",
      "source_label": "Oficial CNAIR",
      "quote": "Deschidere oficială pe Lotul 1: Dumbrava – Mizil la data de 2024-12-23"
    },
    {
      "lot_id": "lot-a7-pl-bz-l1",
      "lot_name": "Lotul 1: Dumbrava – Mizil",
      "type": "contractual",
      "label": "Termen contractual",
      "date": "2024-10",
      "source_label": "Contract semnat",
      "quote": "Termen contractual stabilit la semnarea contractului: 2024-10"
    },
    {
      "lot_id": "lot-a7-pl-bz-l2",
      "lot_name": "Lotul 2: Mizil – Pietroasele",
      "type": "open",
      "label": "Dat în trafic",
      "date": "2025-10-17",
      "source_label": "Oficial CNAIR",
      "quote": "Deschidere oficială pe Lotul 2: Mizil – Pietroasele la data de 2025-10-17"
    },
    {
      "lot_id": "lot-a7-pl-bz-l2",
      "lot_name": "Lotul 2: Mizil – Pietroasele",
      "type": "contractual",
      "label": "Termen contractual",
      "date": "2024-10",
      "source_label": "Contract semnat",
      "quote": "Termen contractual stabilit la semnarea contractului: 2024-10"
    },
    {
      "lot_id": "lot-a7-pl-bz-l3",
      "lot_name": "Lotul 3: Pietroasele – Buzău",
      "type": "open",
      "label": "Dat în trafic",
      "date": "2025-11-27",
      "source_label": "Oficial CNAIR",
      "quote": "Deschidere oficială pe Lotul 3: Pietroasele – Buzău la data de 2025-11-27"
    },
    {
      "lot_id": "lot-a7-pl-bz-l3",
      "lot_name": "Lotul 3: Pietroasele – Buzău",
      "type": "contractual",
      "label": "Termen contractual",
      "date": "2025-11",
      "source_label": "Contract semnat",
      "quote": "Termen contractual stabilit la semnarea contractului: 2025-11"
    },
    {
      "lot_id": "lot-a7-bz-foc-l1",
      "lot_name": "Lotul 1: Buzău – Vadu Pașii",
      "type": "open",
      "label": "Dat în trafic",
      "date": "2025-07-11",
      "source_label": "Oficial CNAIR",
      "quote": "Deschidere oficială pe Lotul 1: Buzău – Vadu Pașii la data de 2025-07-11"
    },
    {
      "lot_id": "lot-a7-bz-foc-l1",
      "lot_name": "Lotul 1: Buzău – Vadu Pașii",
      "type": "contractual",
      "label": "Termen contractual",
      "date": "2025-07",
      "source_label": "Contract semnat",
      "quote": "Termen contractual stabilit la semnarea contractului: 2025-07"
    },
    {
      "lot_id": "lot-a7-bz-foc-l2",
      "lot_name": "Lotul 2: Vadu Pașii – Râmnicu Sărat",
      "type": "open",
      "label": "Dat în trafic",
      "date": "2024-11-20",
      "source_label": "Oficial CNAIR",
      "quote": "Deschidere oficială pe Lotul 2: Vadu Pașii – Râmnicu Sărat la data de 2024-11-20"
    },
    {
      "lot_id": "lot-a7-bz-foc-l2",
      "lot_name": "Lotul 2: Vadu Pașii – Râmnicu Sărat",
      "type": "contractual",
      "label": "Termen contractual",
      "date": "2025-04",
      "source_label": "Contract semnat",
      "quote": "Termen contractual stabilit la semnarea contractului: 2025-04"
    },
    {
      "lot_id": "lot-a7-bz-foc-l3",
      "lot_name": "Lotul 3: Râmnicu Sărat – Mândrești Munteni",
      "type": "open",
      "label": "Dat în trafic",
      "date": "2024-12-20",
      "source_label": "Oficial CNAIR",
      "quote": "Deschidere oficială pe Lotul 3: Râmnicu Sărat – Mândrești Munteni la data de 2024-12-20"
    },
    {
      "lot_id": "lot-a7-bz-foc-l3",
      "lot_name": "Lotul 3: Râmnicu Sărat – Mândrești Munteni",
      "type": "contractual",
      "label": "Termen contractual",
      "date": "2025-04",
      "source_label": "Contract semnat",
      "quote": "Termen contractual stabilit la semnarea contractului: 2025-04"
    },
    {
      "lot_id": "lot-a7-bz-foc-l4",
      "lot_name": "Lotul 4: Mândrești Munteni – Focșani Nord",
      "type": "open",
      "label": "Dat în trafic",
      "date": "2024-11-07",
      "source_label": "Oficial CNAIR",
      "quote": "Deschidere oficială pe Lotul 4: Mândrești Munteni – Focșani Nord la data de 2024-11-07"
    },
    {
      "lot_id": "lot-a7-bz-foc-l4",
      "lot_name": "Lotul 4: Mândrești Munteni – Focșani Nord",
      "type": "contractual",
      "label": "Termen contractual",
      "date": "2024-08",
      "source_label": "Contract semnat",
      "quote": "Termen contractual stabilit la semnarea contractului: 2024-08"
    },
    {
      "lot_id": "lot-a7-foc-bc-l1",
      "lot_name": "Lotul 1: Focșani – Domnești Târg",
      "type": "open",
      "label": "Dat în trafic",
      "date": "2025-12-23",
      "source_label": "Oficial CNAIR",
      "quote": "Deschidere oficială pe Lotul 1: Focșani – Domnești Târg la data de 2025-12-23"
    },
    {
      "lot_id": "lot-a7-foc-bc-l1",
      "lot_name": "Lotul 1: Focșani – Domnești Târg",
      "type": "contractual",
      "label": "Termen contractual",
      "date": "2025-11",
      "source_label": "Contract semnat",
      "quote": "Termen contractual stabilit la semnarea contractului: 2025-11"
    },
    {
      "lot_id": "lot-a7-foc-bc-l2",
      "lot_name": "Lotul 2: Domnești Târg – Răcăciuni",
      "type": "open",
      "label": "Dat în trafic",
      "date": "2026-08-31",
      "source_label": "Oficial CNAIR",
      "quote": "Deschidere oficială pe Lotul 2: Domnești Târg – Răcăciuni la data de 2026-08-31"
    },
    {
      "lot_id": "lot-a7-foc-bc-l2",
      "lot_name": "Lotul 2: Domnești Târg – Răcăciuni",
      "type": "contractual",
      "label": "Termen contractual",
      "date": "2025-11",
      "source_label": "Contract semnat",
      "quote": "Termen contractual stabilit la semnarea contractului: 2025-11"
    },
    {
      "lot_id": "lot-a7-foc-bc-l3",
      "lot_name": "Lotul 3: Răcăciuni – Bacău",
      "type": "open",
      "label": "Dat în trafic",
      "date": "2026-08-31",
      "source_label": "Oficial CNAIR",
      "quote": "Deschidere oficială pe Lotul 3: Răcăciuni – Bacău la data de 2026-08-31"
    },
    {
      "lot_id": "lot-a7-foc-bc-l3",
      "lot_name": "Lotul 3: Răcăciuni – Bacău",
      "type": "contractual",
      "label": "Termen contractual",
      "date": "2025-11",
      "source_label": "Contract semnat",
      "quote": "Termen contractual stabilit la semnarea contractului: 2025-11"
    },
    {
      "lot_id": "lot-a7-centura-bc",
      "lot_name": "Varianta Ocolitoare Bacău (Profil Autostradă)",
      "type": "open",
      "label": "Dat în trafic",
      "date": "2020-12-02",
      "source_label": "Oficial CNAIR",
      "quote": "Deschidere oficială pe Varianta Ocolitoare Bacău (Profil Autostradă) la data de 2020-12-02"
    },
    {
      "lot_id": "lot-a7-centura-bc",
      "lot_name": "Varianta Ocolitoare Bacău (Profil Autostradă)",
      "type": "contractual",
      "label": "Termen contractual",
      "date": "2022-01",
      "source_label": "Contract semnat",
      "quote": "Termen contractual stabilit la semnarea contractului: 2022-01"
    },
    {
      "lot_id": "lot-a7-bc-pas-l1",
      "lot_name": "Lotul 1: Săucești – Trifești",
      "type": "estimated",
      "label": "Deschidere estimată",
      "date": "2026-Q4",
      "source_label": "Grafic de execuție",
      "quote": "Deschidere estimată conform raportărilor: 2026-Q4"
    },
    {
      "lot_id": "lot-a7-bc-pas-l2",
      "lot_name": "Lotul 2: Trifești – Gherăești (Mircești)",
      "type": "estimated",
      "label": "Deschidere estimată",
      "date": "2026-Q4",
      "source_label": "Grafic de execuție",
      "quote": "Deschidere estimată conform raportărilor: 2026-Q4"
    },
    {
      "lot_id": "lot-a7-bc-pas-l2",
      "lot_name": "Lotul 2: Trifești – Gherăești (Mircești)",
      "type": "contractual",
      "label": "Termen contractual",
      "date": "2026-10-10",
      "source_label": "Contract semnat",
      "quote": "Termen contractual stabilit la semnarea contractului: 2026-10-10"
    },
    {
      "lot_id": "lot-a7-bc-pas-l3",
      "lot_name": "Lotul 3: Mircești – Pașcani",
      "type": "estimated",
      "label": "Deschidere estimată",
      "date": "2027-Q2",
      "source_label": "Grafic de execuție",
      "quote": "Deschidere estimată conform raportărilor: 2027-Q2"
    },
    {
      "lot_id": "lot-a7-bc-pas-l3",
      "lot_name": "Lotul 3: Mircești – Pașcani",
      "type": "contractual",
      "label": "Termen contractual",
      "date": "2026-12-22",
      "source_label": "Contract semnat",
      "quote": "Termen contractual stabilit la semnarea contractului: 2026-12-22"
    }
  ]
}