  "id": "a3",
  "ref": "A3",
  "name": "A3 Autostrada Transilvania (București – Ploiești – Brașov – Cluj – Borș)",
  "status": "partial_open",
  "status_label": "Parțial deschis",
  "status_detail": "Parțial deschis: 212,8 din 344,0 km",
  "open_km": 212.84,
  "total_km": 343.98,
  "sections": [
    {
      "id": "sec-a3-buc-pl",
      "name": "București – Ploiești",
      "status": "open",
      "status_label": "Deschis",
      "status_detail": "Deschis: 62,0 km",
      "open_km": 62,
      "total_km": 62,
      "lots": [
        {
          "id": "lot-a3-buc-petricani",
          "lot_id": "lot-a3-buc-petricani",
          "name": "București (Șos. Petricani) – Centura A0",
          "lot_name": "București (Șos. Petricani) – Centura A0",
          "length_km": 6.5,
          "profile": "motorway",
          "status": "open",
          "status_label": "Deschis",
          "status_detail": "Deschis: 6,5 km",
          "contractor": "Asocierea Aktor SA – Euroconstruct Trading '98 SRL",
          "contract_value": "129.18 mil. lei (fără TVA)",
          "financing": "Bugetul de stat",
          "progress_percent": 100,
          "contractual_date": "2017-11",
          "estimated_date": null,
          "actual_date": "2018-12-14",
          "attributed_range": null,
          "is_hand_drawn": false,
          "bbox": [
            26.125516,
            44.478485,
            26.17406,
            44.522334
          ]
        },
        {
          "id": "lot-a3-buc-pl",
          "lot_id": "lot-a3-buc-pl",
          "name": "Centura București (A0) – Ploiești (Bărcănești)",
          "lot_name": "Centura București (A0) – Ploiești (Bărcănești)",
          "length_km": 55.5,
          "profile": "motorway",
          "status": "open",
          "status_label": "Deschis",
          "status_detail": "Deschis: 55,5 km",
          "contractor": "Asocierea Spedition UMB – Pa&Co International – Euroconstruct Trading '98 / Impresa Pizzarotti",
          "contract_value": "450 mil. EUR",
          "financing": "Bugetul de stat",
          "progress_percent": 100,
          "contractual_date": "2012-06",
          "estimated_date": null,
          "actual_date": "2012-07-19",
          "attributed_range": null,
          "is_hand_drawn": false,
          "bbox": [
            26.016887,
            44.522334,
            26.256468,
            44.888905
          ]
        }
      ]
    },
    {
      "id": "sec-a3-rasnov",
      "name": "Râșnov – Cristian",
      "status": "open",
      "status_label": "Deschis",
      "status_detail": "Deschis: 6,3 km",
      "open_km": 6.3,
      "total_km": 6.3,
      "lots": [
        {
          "id": "lot-a3-rasnov",
          "lot_id": "lot-a3-rasnov",
          "name": "Râșnov – Cristian",
          "lot_name": "Râșnov – Cristian",
          "length_km": 6.3,
          "profile": "motorway",
          "status": "open",
          "status_label": "Deschis",
          "status_detail": "Deschis: 6,3 km",
          "contractor": "Asocierea Alpenside – Specialist Consulting",
          "contract_value": "118.02 mil. lei (fără TVA)",
          "financing": "Fondul de Coeziune (POIM) / Buget de stat",
          "progress_percent": 100,
          "contractual_date": "2020-10",
          "estimated_date": null,
          "actual_date": "2020-12-17",
          "attributed_range": null,
          "is_hand_drawn": false,
          "bbox": [
            25.444383,
            45.577337,
            25.457468,
            45.632825
          ]
        }
      ]
    },
    {
      "id": "sec-a3-cristian-codlea",
      "name": "Cristian – Codlea",
      "status": "planned",
      "status_label": "Planificat",
      "status_detail": "Planificat: 5,2 km",
      "open_km": 0,
      "total_km": 5.18,
      "lots": [
        {
          "id": "lot-a3-cristian-codlea",
          "lot_id": "lot-a3-cristian-codlea",
          "name": "Sector Cristian – Codlea (Ploiești – Brașov)",
          "lot_name": "Sector Cristian – Codlea (Ploiești – Brașov)",
          "length_km": 5.18,
          "profile": "motorway",
          "status": "planned",
          "status_label": "Planificat",
          "status_detail": "Planificat: 5,2 km",
          "contractor": null,
          "contract_value": "738.07 mil. lei (C+M)",
          "financing": null,
          "progress_percent": 0,
          "contractual_date": null,
          "estimated_date": null,
          "actual_date": null,
          "attributed_range": null,
          "is_hand_drawn": true,
          "bbox": [
            25.448,
            45.632825,
            25.457468,
            45.6785
          ]
        }
      ]
    },
    {
      "id": "sec-a3-tgm-cluj",
      "name": "Târgu Mureș – Câmpia Turzii – Gilău – Nădășelu",
      "status": "open",
      "status_label": "Deschis",
      "status_detail": "Deschis: 113,4 km",
      "open_km": 113.4,
      "total_km": 113.4,
      "lots": [
        {
          "id": "lot-a3-tgm-ungheni",
          "lot_id": "lot-a3-tgm-ungheni",
          "name": "Târgu Mureș – Ungheni",
          "lot_name": "Târgu Mureș – Ungheni",
          "length_km": 4.5,
          "profile": "motorway",
          "status": "open",
          "status_label": "Deschis",
          "status_detail": "Deschis: 4,5 km",
          "contractor": "Strabag SRL",
          "contract_value": "192.05 mil. lei (fără TVA)",
          "financing": "Fondul de Coeziune (POIM) / Buget de stat",
          "progress_percent": 100,
          "contractual_date": "2021-11",
          "estimated_date": null,
          "actual_date": "2021-12-06",
          "attributed_range": null,
          "is_hand_drawn": false,
          "bbox": [
            24.46802,
            46.472102,
            24.525104,
            46.480594
          ]
        },
        {
          "id": "lot-a3-ungheni-ogra",
          "lot_id": "lot-a3-ungheni-ogra",
          "name": "Ungheni – Ogra",
          "lot_name": "Ungheni – Ogra",
          "length_km": 10.1,
          "profile": "motorway",
          "status": "open",
          "status_label": "Deschis",
          "status_detail": "Deschis: 10,1 km",
          "contractor": "Asocierea Strabag – Straco Grup",
          "contract_value": "251.35 mil. lei (fără TVA)",
          "financing": "Fondul de Coeziune (POIM) / Buget de stat",
          "progress_percent": 100,
          "contractual_date": "2016-06",
          "estimated_date": null,
          "actual_date": "2018-12-12",
          "attributed_range": null,
          "is_hand_drawn": false,
          "bbox": [
            24.348591,
            46.442082,
            24.46802,
            46.478594
          ]
        },
        {
          "id": "lot-a3-ogra-iernut",
          "lot_id": "lot-a3-ogra-iernut",
          "name": "Ogra – Iernut",
          "lot_name": "Ogra – Iernut",
          "length_km": 3.6,
          "profile": "motorway",
          "status": "open",
          "status_label": "Deschis",
          "status_detail": "Deschis: 3,6 km",
          "contractor": "Asocierea Geiger Transilvania – Wilhelm Geiger",
          "contract_value": "55.78 mil. lei (fără TVA)",
          "financing": "Fondul de Coeziune (POIM) / Buget de stat",
          "progress_percent": 100,
          "contractual_date": "2016-05",
          "estimated_date": null,
          "actual_date": "2018-12-12",
          "attributed_range": null,
          "is_hand_drawn": false,
          "bbox": [
            24.294419,
            46.435009,
            24.348591,
            46.442082
          ]
        },
        {
          "id": "lot-a3-iernut-chetani",
          "lot_id": "lot-a3-iernut-chetani",
          "name": "Iernut – Chețani",
          "lot_name": "Iernut – Chețani",
          "length_km": 17.9,
          "profile": "motorway",
          "status": "open",
          "status_label": "Deschis",
          "status_detail": "Deschis: 17,9 km",
          "contractor": "Asocierea Astaldi – Max Bögl",
          "contract_value": "437.63 mil. lei (fără TVA)",
          "financing": "Fondul de Coeziune (POIM) / Buget de stat",
          "progress_percent": 100,
          "contractual_date": "2017-07",
          "estimated_date": null,
          "actual_date": "2020-09-18",
          "attributed_range": null,
          "is_hand_drawn": false,
          "bbox": [
            24.074682,
            46.430184,
            24.294419,
            46.459266
          ]
        },
        {
          "id": "lot-a3-chetani-ct",
          "lot_id": "lot-a3-chetani-ct",
          "name": "Chețani – Câmpia Turzii",
          "lot_name": "Chețani – Câmpia Turzii",
          "length_km": 15.7,
          "profile": "motorway",
          "status": "open",
          "status_label": "Deschis",
          "status_detail": "Deschis: 15,7 km",
          "contractor": "Asocierea Strabag – Geiger Transilvania",
          "contract_value": "420.35 mil. lei (fără TVA)",
          "financing": "Fondul de Coeziune (POIM / PT) / Buget de stat",
          "progress_percent": 100,
          "contractual_date": "2024-08",
          "estimated_date": null,
          "actual_date": "2023-12-21",
          "attributed_range": null,
          "is_hand_drawn": false,
          "bbox": [
            23.92783,
            46.45425,
            24.074682,
            46.518517
          ]
        },
        {
          "id": "lot-a3-2b-ct-gilau",
          "lot_id": "lot-a3-2b-ct-gilau",
          "name": "Secțiunea 2B: Câmpia Turzii – Turda – Gilău",
          "lot_name": "Secțiunea 2B: Câmpia Turzii – Turda – Gilău",
          "length_km": 52,
          "profile": "motorway",
          "status": "open",
          "status_label": "Deschis",
          "status_detail": "Deschis: 52,0 km",
          "contractor": "Bechtel International",
          "contract_value": "1.40 mld. EUR",
          "financing": "Bugetul de stat",
          "progress_percent": 100,
          "contractual_date": "2010-12",
          "estimated_date": null,
          "actual_date": "2010-11-13",
          "attributed_range": null,
          "is_hand_drawn": false,
          "bbox": [
            23.410985,
            46.518517,
            23.92783,
            46.755755
          ]
        },
        {
          "id": "lot-a3-gilau-nadaselu",
          "lot_id": "lot-a3-gilau-nadaselu",
          "name": "Subsecțiunea 3A1: Gilău – Nădășelu",
          "lot_name": "Subsecțiunea 3A1: Gilău – Nădășelu",
          "length_km": 9.6,
          "profile": "motorway",
          "status": "open",
          "status_label": "Deschis",
          "status_detail": "Deschis: 9,6 km",
          "contractor": "Asocierea Spedition UMB – Tehnostrade",
          "contract_value": "258.20 mil. lei (fără TVA)",
          "financing": "Bugetul de stat / POIM",
          "progress_percent": 100,
          "contractual_date": "2016-04",
          "estimated_date": null,
          "actual_date": "2018-09-28",
          "attributed_range": null,
          "is_hand_drawn": false,
          "bbox": [
            23.383327,
            46.755755,
            23.427532,
            46.81202
          ]
        }
      ]
    },
    {
      "id": "sec-a3-salaj-bh",
      "name": "Nădășelu – Poarta Sălajului – Suplacu – Borș",
      "status": "partial_open",
      "status_label": "Parțial deschis",
      "status_detail": "Parțial deschis: 31,1 din 157,1 km",
      "open_km": 31.14,
      "total_km": 157.1,
      "lots": [
        {
          "id": "lot-a3-nad-zimbor",
          "lot_id": "lot-a3-nad-zimbor",
          "name": "Subsecțiunile 3A2 + 3B1: Nădășelu – Mihăiești – Zimbor",
          "lot_name": "Subsecțiunile 3A2 + 3B1: Nădășelu – Mihăiești – Zimbor",
          "length_km": 30.06,
          "profile": "motorway",
          "status": "construction",
          "status_label": "În execuție",
          "status_detail": "În execuție: 30,1 km",
          "contractor": "Asocierea Spedition UMB – Tehnostrade – Electromontaj",
          "contract_value": "1495.9 mil. lei fără TVA",
          "financing": "PNRR / Bugetul de stat",
          "progress_percent": 99.3,
          "contractual_date": "2026-10-22",
          "estimated_date": "2026-12",
          "actual_date": null,
          "attributed_range": null,
          "is_hand_drawn": false,
          "bbox": [
            23.244839,
            46.81202,
            23.422133,
            46.99088
          ]
        },
        {
          "id": "lot-a3-zimbor-ps",
          "lot_id": "lot-a3-zimbor-ps",
          "name": "Subsecțiunea 3B2: Zimbor – Poarta Sălajului",
          "lot_name": "Subsecțiunea 3B2: Zimbor – Poarta Sălajului",
          "length_km": 12.24,
          "profile": "motorway",
          "status": "open",
          "status_label": "Deschis",
          "status_detail": "Deschis: 12,2 km",
          "contractor": "Asocierea SA&PE Construct – Spedition UMB – Tehnostrade",
          "contract_value": "836.9 mil. lei fără TVA",
          "financing": "PNRR / Bugetul de stat",
          "progress_percent": 100,
          "contractual_date": null,
          "estimated_date": null,
          "actual_date": "2026-08-11",
          "attributed_range": null,
          "is_hand_drawn": false,
          "bbox": [
            23.18061,
            46.99088,
            23.244839,
            47.084065
          ]
        },
        {
          "id": "lot-a3-ps-nusf",
          "lot_id": "lot-a3-ps-nusf",
          "name": "Subsecțiunile 3B3 + 3B4: Poarta Sălajului – Zalău – Nușfalău (Tunel Meseș)",
          "lot_name": "Subsecțiunile 3B3 + 3B4: Poarta Sălajului – Zalău – Nușfalău (Tunel Meseș)",
          "length_km": 41,
          "profile": "motorway",
          "status": "design",
          "status_label": "În proiectare",
          "status_detail": "În proiectare: 41,0 km",
          "contractor": "Asocierea Makyol – Özaltın",
          "contract_value": "6.62 mld. lei fără TVA",
          "financing": "Programul Transport (PT) / Bugetul de stat",
          "progress_percent": null,
          "contractual_date": "2032-05",
          "estimated_date": "2031",
          "actual_date": null,
          "attributed_range": null,
          "is_hand_drawn": false,
          "bbox": [
            22.706696,
            47.084065,
            23.18061,
            47.17988
          ]
        },
        {
          "id": "lot-a3-nusf-suplacu",
          "lot_id": "lot-a3-nusf-suplacu",
          "name": "Subsecțiunea 3B5: Nușfalău – Suplacu de Barcău",
          "lot_name": "Subsecțiunea 3B5: Nușfalău – Suplacu de Barcău",
          "length_km": 13.55,
          "profile": "motorway",
          "status": "open",
          "status_label": "Deschis",
          "status_detail": "Deschis: 13,6 km",
          "contractor": "Nurol Insaat ve Ticaret A.S.",
          "contract_value": "384.1 mil. lei fără TVA",
          "financing": "Fondul de Coeziune (POIM / PT) / Buget de stat",
          "progress_percent": 100,
          "contractual_date": null,
          "estimated_date": null,
          "actual_date": "2023-09-21",
          "attributed_range": null,
          "is_hand_drawn": false,
          "bbox": [
            22.55457,
            47.176375,
            22.706696,
            47.225645
          ]
        },
        {
          "id": "lot-a3-suplacu-chiribis",
          "lot_id": "lot-a3-suplacu-chiribis",
          "name": "Subsecțiunea 3C1: Suplacu de Barcău – Chiribiș",
          "lot_name": "Subsecțiunea 3C1: Suplacu de Barcău – Chiribiș",
          "length_km": 26.35,
          "profile": "motorway",
          "status": "construction",
          "status_label": "În execuție",
          "status_detail": "În execuție: 26,4 km",
          "contractor": "Construcții Erbașu",
          "contract_value": "884.1 mil. lei fără TVA",
          "financing": "Programul Transport (PT) / Bugetul de stat",
          "progress_percent": 95.39,
          "contractual_date": "2026-08",
          "estimated_date": "2026-12",
          "actual_date": null,
          "attributed_range": null,
          "is_hand_drawn": false,
          "bbox": [
            22.260954,
            47.225645,
            22.55457,
            47.302381
          ]
        },
        {
          "id": "lot-a3-chiribis-biharia",
          "lot_id": "lot-a3-chiribis-biharia",
          "name": "Subsecțiunea 3C2: Chiribiș – Biharia",
          "lot_name": "Subsecțiunea 3C2: Chiribiș – Biharia",
          "length_km": 28.55,
          "profile": "motorway",
          "status": "construction",
          "status_label": "În execuție",
          "status_detail": "În execuție: 28,6 km",
          "contractor": "Asocierea Precon Transilvania – Citadina 98",
          "contract_value": "785.2 mil. lei fără TVA",
          "financing": "Programul Transport (PT) / Bugetul de stat",
          "progress_percent": 87,
          "contractual_date": "2027-05",
          "estimated_date": "2026-12",
          "actual_date": null,
          "attributed_range": null,
          "is_hand_drawn": false,
          "bbox": [
            21.927719,
            47.181521,
            22.260954,
            47.2782
          ]
        },
        {
          "id": "lot-a3-biharia-bors",
          "lot_id": "lot-a3-biharia-bors",
          "name": "Subsecțiunea 3C3: Biharia – Borș II (frontieră HU)",
          "lot_name": "Subsecțiunea 3C3: Biharia – Borș II (frontieră HU)",
          "length_km": 5.35,
          "profile": "motorway",
          "status": "open",
          "status_label": "Deschis",
          "status_detail": "Deschis: 5,4 km",
          "contractor": "Asocierea Trameco – Vahostav – Drumuri Bihor",
          "contract_value": "134.22 mil. lei (fără TVA)",
          "financing": "Fondul de Coeziune (POIM) / Buget de stat",
          "progress_percent": 100,
          "contractual_date": "2020-07",
          "estimated_date": null,
          "actual_date": "2020-09-04",
          "attributed_range": null,
          "is_hand_drawn": false,
          "bbox": [
            21.859222,
            47.183906,
            21.927719,
            47.19673
          ]
        }
      ]
    }
  ],
  "stories": [
    {
      "id": "sc-6468e2ed92db",
      "title": "„Nodul dintre A0 și A3 a fost umflat la 208 hectare”, susține un fost ministru al Transporturilor. Acuzații la adresa…",
      "extracted_headline": "Drulă: nodul A0–A3 ar fi fost extins la 208 hectare, cu costuri suplimentare",
      "summary": "Pe 22 noiembrie 2026 deputatul Cătălin Drulă afirmă că nodul dintre A0 și A3 a fost mărit de la 82 la 208 hectare, generând cheltuieli suplimentare de 61 milioane lei.",
      "url": "https://hotnews.ro/nodul-dintre-a0-si-a3-a-fost-umflat-la-208-hectare-sustine-un-fost-ministru-al-transporturilor-acuzatii-la-adresa-sefului-cnair-2411164",
      "published_at": "2026-11-22T20:46:00Z",
      "roads": [
        "A0",
        "A3"
      ],
      "lot_id": null,
      "lot_ids": [],
      "source": {
        "id": "hotnews",
        "name": "HotNews",
        "trust_tier": 2
      },
      "co_citations": [
        {
          "id": "art-5e5ec8b8d34c",
          "source_name": "Digi24",
          "url": "https://www.digi24.ro/stiri/economie/transporturi/catalin-drula-nodul-dintre-a0-a3-a-fost-umflat-de-la-82-la-208-hectare-ce-nereguli-reclama-fostul-ministru-al-transporturilor-4048263",
          "title": "Cătălin Drulă: „Nodul dintre A0-A3 a fost umflat de la 82 la 208 hectare”. Ce nereguli reclamă fostul ministru al…"
        },
        {
          "id": "art-56a35f337614",
          "source_name": "G4Media",
          "url": "https://www.g4media.ro/drula-acuza-ca-nodul-rutier-a0-a3-a-fost-extins-nejustificat-cu-un-cost-suplimentar-de-61-de-milioane-de-lei.html",
          "title": "Drulă acuză că nodul rutier A0-A3 a fost extins nejustificat, cu un cost suplimentar de 61 de milioane de lei"
        }
      ]
    },
    {
      "id": "sc-f065711c0600",
      "title": "Autostrada Transilvania: Lucrările pe un tronson de 26 de kilometri au ajuns la 98%. Când ar putea fi deschis…",
      "extracted_headline": "Lotul Suplacu de Barcău–Chiribis (A3) este finalizat în proporție de 98%, deschidere estimată la finalul anului",
      "summary": "Construcții Erbașu a raportat că lucrările pe sectorul Suplacu de Barcău–Chiribiş (A3) sunt 98% finalizate și estimat se deschid până la sfârșitul anului 2026.",
      "url": "https://www.mediafax.ro/economic/autostrada-transilvania-lucrarile-pe-un-tronson-de-26-de-kilometri-au-ajuns-la-98-cand-ar-putea-fi-deschis-circulatiei-dupa-22-de-ani-23847185",
      "published_at": "2026-11-21T08:09:28Z",
      "roads": [
        "A3"
      ],
      "lot_id": "lot-a3-suplacu-chiribis",
      "lot_ids": [
        "lot-a3-suplacu-chiribis"
      ],
      "source": {
        "id": "mediafax",
        "name": "Mediafax",
        "trust_tier": 2
      },
      "co_citations": [
        {
          "id": "art-9cdc0506e49b",
          "source_name": "Economedia",
          "url": "https://economedia.ro/autostrada-transilvania-lucrarile-pe-lotul-suplacu-de-barcau-chiribis-se-apropie-de-final-deschiderea-circulatiei-va-avea-loc-pana-la-finalul-anului.html",
          "title": "Autostrada Transilvania. Lucrările pe lotul Suplacu de Barcău – Chiribiș se apropie de final. Deschiderea circulației…"
        },
        {
          "id": "art-c637767139d7",
          "source_name": "G4Media",
          "url": "https://www.g4media.ro/autostrada-transilvania-un-tronson-de-26-km-a-ajuns-la-un-stadiu-de-98.html",
          "title": "Autostrada Transilvania: Un tronson de 26 km a ajuns la un stadiu de 98%"
        },
        {
          "id": "art-c250cd5896f7",
          "source_name": "Adevărul",
          "url": "https://adevarul.ro/stiri-interne/cand-ar-putea-fi-deschisa-circulatia-pe-un-nou-2573291.html",
          "title": "Când ar putea fi deschisă circulația pe un nou tronson al Autostrăzii Transilvania. Lucrările au ajuns la 98%"
        },
        {
          "id": "art-cd1beeae73f4",
          "source_name": "Economica.net",
          "url": "https://www.economica.net/autostrada-a3-transilvania-31_997885.html",
          "title": "VIDEO Autostrada A3 Transilvania: Lucrările la secțiunea Suplacu de Barcău - Chiribiș au ajuns la 98% - Economica.net"
        }
      ]
    },
    {
      "id": "sc-8cd176fc1a6c",
      "title": "VIDEO Autostrada A3 Transilvania: Termină turcii de la Ozaltin lucrările la mega-viaducte în 2026? Pariurile…",
      "extracted_headline": "Ozaltin: 82% la secțiunea viaductelor din A3; UMB la 99,20% pentru porțiunea Nădășelu–Zimbor",
      "summary": "Pe 21 noiembrie 2026, asocierea condusă de Ozaltin raportează 82% pe secțiunea de aproape 6 km cu mega-viaducte din A3, iar UMB 99,20% pe tronsonul Nădășelu–Zimbor.",
      "url": "https://www.economica.net/autostrada-a3-transilvania-30_997827.html",
      "published_at": "2026-11-21T07:22:54Z",
      "roads": [
        "A3"
      ],
      "lot_id": "lot-a3-nad-zimbor",
      "lot_ids": [
        "lot-a3-nad-zimbor"
      ],
      "source": {
        "id": "economica",
        "name": "Economica.net",
        "trust_tier": 2
      },
      "co_citations": []
    },
    {
      "id": "sc-2afff6192af6",
      "title": "Autostrazile Romaniei vor avea 72 de noi tuneluri rutiere",
      "extracted_headline": "Plan pentru 72 de tuneluri rutiere în România, lungime totală >31 km, incluse în proiecte 2026–2030",
      "summary": "Autoritățile prognozează realizarea a 72 de tuneluri rutiere în proiecte 2026–2030 în România, cu lungime cumulată de peste 31 km, conform unui proiect normativ publicat în noiembrie 2026.",
      "url": "https://arenaconstruct.ro/autostrazile-romaniei-vor-avea-72-noi-tuneluri-rutiere",
      "published_at": "2026-11-20T11:21:37Z",
      "roads": [
        "A1",
        "A3",
        "A8"
      ],
      "lot_id": "lot-a1-pit-sb-s4",
      "lot_ids": [
        "lot-a1-pit-sb-s4",
        "lot-a3-ps-nusf"
      ],
      "source": {
        "id": "arenaconstruct",
        "name": "Arena Construcțiilor",
        "trust_tier": 2
      },
      "co_citations": []
    },
    {
      "id": "sc-bcdda641fc2c",
      "title": "Autostrada A3 Chiribiș-Suplacu, gata la început de decembrie",
      "extracted_headline": "Lotul A3 Chiribiș–Suplacu poate fi dat în trafic la începutul lui decembrie 2026",
      "summary": "Lotul A3 Chiribiș–Suplacu de Barcău (26,35 km), executat de Erbașu, poate fi dat în trafic la începutul decembrie 2026, cu cinci luni întârziere față de termenul contractual.",
      "url": "https://proinfrastructura.ro/luari-de-pozitie/autostrada-a3-chiribis-suplacu-gata-la-inceput-de-decembrie",
      "published_at": "2026-11-16T20:01:19Z",
      "roads": [
        "A3"
      ],
      "lot_id": "lot-a3-suplacu-chiribis",
      "lot_ids": [
        "lot-a3-suplacu-chiribis"
      ],
      "source": {
        "id": "proinfrastructura",
        "name": "Asociația Pro Infrastructură",
        "trust_tier": 2
      },
      "co_citations": [
        {
          "id": "art-7f0b15309016",
          "source_name": "Arena Construcțiilor",
          "url": "https://arenaconstruct.ro/autostrada-a3-transilvania-suplacu-de-barcau-chiribis-s-ar-putea-deschide-in-decembrie-iar-chiribis-biharia-ceva-mai-tarziu",
          "title": "Autostrada A3 Transilvania: Suplacu de Barcau – Chiribis s-ar putea deschide in decembrie, iar Chiribis – Biharia ceva…"
        },
        {
          "id": "art-a342b4ae3086",
          "source_name": "HotNews",
          "url": "https://hotnews.ro/video-tronsonul-blestemat-de-pe-autostrada-transilvania-gata-in-decembrie-daca-se-doreste-dupa-22-de-ani-cum-arata-acum-celebrul-pod-din-mijlocul-unui-lac-de-acumulare-2405936",
          "title": "VIDEO Tronsonul blestemat de pe Autostrada Transilvania, gata în decembrie „dacă se dorește”, după 22 de ani. Cum…"
        }
      ]
    },
    {
      "id": "sc-9ea7f724771d",
      "title": "57 de kilometri noi de autostradă în România. Două tronsoane de pe A3 Transilvania vor fi date în trafic luna viitoare",
      "extracted_headline": "Două tronsoane A3 (aprox. 57 km) vor fi date în trafic în a doua jumătate a lunii decembrie 2026",
      "summary": "Ministerul Transporturilor și CNAIR anunță deschiderea traficului pe A3 Nădășelu–Zimbor și Suplacu de Barcău–Chiribiș, în a doua jumătate a lunii decembrie 2026.",
      "url": "https://www.economica.net/autostrada-a3-transilvania-28_994814.html",
      "published_at": "2026-11-12T16:39:31Z",
      "roads": [
        "A3"
      ],
      "lot_id": "lot-a3-nad-zimbor",
      "lot_ids": [
        "lot-a3-nad-zimbor",
        "lot-a3-suplacu-chiribis"
      ],
      "source": {
        "id": "economica",
        "name": "Economica.net",
        "trust_tier": 2
      },
      "co_citations": [
        {
          "id": "art-2f76ba969e56",
          "source_name": "Economica.net",
          "url": "https://www.economica.net/autostrada-a3-transilvania-29_995211.html",
          "title": "VIDEO Autostrada A3 Transilvania: Se așterne ultimul strat de asfalt pe cel mai lung viaduct - Economica.net"
        }
      ]
    },
    {
      "id": "sc-e8013d42bd32",
      "title": "VIDEO | Drumul Expres Brăila–Galați a ajuns la 98%. UMB a montat doar 32 din cele 204 dale prevăzute pe podul hobanat",
      "extracted_headline": "Drumul Expres Brăila–Galați la 98%: UMB a montat 32 din 204 dale pe podul hobanat",
      "summary": "Ministrul Transporturilor a declarat pe 10 noiembrie 2026 că Drumul Expres Brăila–Galați este realizat în proporție de 98%.",
      "url": "https://economedia.ro/video-drumul-expres-braila-galati-a-ajuns-la-98-umb-a-montat-doar-32-din-cele-204-dale-prevazute-pe-podul-hobanat.html",
      "published_at": "2026-11-10T13:01:58Z",
      "roads": [
        "DEx6",
        "A0",
        "A3",
        "A7",
        "A1"
      ],
      "lot_id": "lot-dex6",
      "lot_ids": [
        "lot-dex6"
      ],
      "source": {
        "id": "economedia",
        "name": "Economedia",
        "trust_tier": 2
      },
      "co_citations": [
        {
          "id": "art-e853822c014c",
          "source_name": "Economedia",
          "url": "https://economedia.ro/in-ce-stadiu-au-ajuns-autostrazile-pe-care-autoritatile-promit-ca-le-vor-deschide-pana-la-finalul-anului-cei-130-de-kilometri-anuntati-de-ministrul-transporturilor.html",
          "title": "În ce stadiu au ajuns autostrăzile pe care autoritățile promit că le vor deschide până la finalul anului. Cei 130 de…"
        }
      ]
    },
    {
      "id": "sc-c2ce6895c735",
      "title": "FOTO Autostrada A3 Transilvania: Românii de la Viarom Construct au așernut asfalt noaptea pe secțiunea…",
      "extracted_headline": "A3 Nădășelu–Mihăiești: asfalt final pus pe deviere, secțiunea turcilor aproape de finalizare",
      "summary": "Echipele au așternut stratul de uzură pe subsecțiunea A3 Nădășelu – Mihăiești (km 8+700–25+500), lucrările fiind în curs de desfășurare.",
      "url": "https://www.economica.net/autostrada-a3-transilvania-26_993691.html",
      "published_at": "2026-11-09T18:13:26Z",
      "roads": [
        "A3"
      ],
      "lot_id": "lot-a3-nad-zimbor",
      "lot_ids": [
        "lot-a3-nad-zimbor"
      ],
      "source": {
        "id": "economica",
        "name": "Economica.net",
        "trust_tier": 2
      },
      "co_citations": []
    },
    {
      "id": "sc-0e5da1ca977a",
      "title": "EXCLUSIV: Radu Miruță îl contrazice pe ministrul Transporturilor în cazul tunelului Momaia: „Au tot întârziat ca să-i…",
      "extracted_headline": "Deschiderea secțiunii Tigveni–Curtea de Argeș (A1) amânată din lipsă de personal pentru tunelul Momaia",
      "summary": "Deschiderea circulației pe secțiunea Tigveni – Curtea de Argeș a autostrăzii A1 Sibiu–Pitești este amânată din cauza lipsei personalului specializat pentru operarea tunelului Momaia.",
      "url": "https://economedia.ro/radu-miruta-il-contrazice-pe-ministrul-transporturilor-in-cazul-tunelului-momaia-au-tot-intarziat-ca-sa-i-ofere-o-ofranda-noului-ministru.html",
      "published_at": "2026-11-09T15:02:28Z",
      "roads": [
        "A1",
        "A3",
        "A7",
        "A0",
        "A8",
        "DEx6"
      ],
      "lot_id": "lot-a1-pit-sb-s4",
      "lot_ids": [
        "lot-a1-pit-sb-s4"
      ],
      "source": {
        "id": "economedia",
        "name": "Economedia",
        "trust_tier": 2
      },
      "co_citations": [
        {
          "id": "art-90065250442f",
          "source_name": "Economedia",
          "url": "https://economedia.ro/document-radu-miruta-a-permis-ocuparea-posturilor-vacante-pentru-administrarea-infrastructurii.html",
          "title": "DOCUMENT: Radu Miruță afirmă că a permis ocuparea posturilor vacante pentru administrarea infrastructurii"
        },
        {
          "id": "art-8ba2a23da312",
          "source_name": "Adevărul",
          "url": "https://adevarul.ro/economie/se-amana-deschiderea-unui-tronson-din-autostrada-2570139.html",
          "title": "Dispută politică pe tema tunelului Momaia. Deschiderea unui tronson din Autostrada Sibiu–Pitești, amânată"
        },
        {
          "id": "art-6c89a6a48f54",
          "source_name": "Economedia",
          "url": "https://economedia.ro/tunelul-momaia-de-pe-a1-sibiu-pitesti-nu-se-mai-deschide-ministrul-transporturilor-il-acuza-pe-radu-miruta-ca-a-blocat-ordinul-necesar-ce-autostrazi-se-deschid-totusi-pana-la-final.html",
          "title": "Tunelul Momaia de pe A1 Sibiu–Pitești nu se poate deschide. Ministrul Transporturilor îl acuză pe Radu Miruță că a…"
        }
      ]
    },
    {
      "id": "sc-cd452bcb6193",
      "title": "Câți kilometri de autostrăzi și drumuri expres se vor mai deschide în acest an. Anunțul ministrului Transporturilor",
      "extracted_headline": "Deschiderea tunelului Curtea de Argeș – Tigveni amânată din lipsă de personal specializat",
      "summary": "Tunelul Momaia de pe secțiunea Curtea de Argeș – Tigveni (A1) nu poate fi deschis imediat după finalizarea lucrărilor deoarece nu există personal specializat pentru operare şi monitorizare.",
      "url": "https://www.mediafax.ro/economic/cati-kilometri-de-autostrazi-si-drumuri-expres-se-vor-mai-deschide-in-acest-an-anuntul-ministrului-transporturilor-23840279",
      "published_at": "2026-11-09T14:39:44Z",
      "roads": [
        "A0",
        "A3",
        "A7",
        "A1",
        "DEx6"
      ],
      "lot_id": "lot-a1-pit-sb-s4",
      "lot_ids": [
        "lot-a1-pit-sb-s4"
      ],
      "source": {
        "id": "mediafax",
        "name": "Mediafax",
        "trust_tier": 2
      },
      "co_citations": [
        {
          "id": "art-cf8e1c6b6536",
          "source_name": "Arena Construcțiilor",
          "url": "https://arenaconstruct.ro/deschiderea-tunelului-curtea-de-arges-intarziata-de-lipsa-personalului-specializat",
          "title": "Deschiderea tunelului de la Curtea de Arges, intarziata de lipsa personalului specializat"
        },
        {
          "id": "art-c267b50031b8",
          "source_name": "Economica.net",
          "url": "https://www.economica.net/primul-tunel-de-autostrada-3_993558.html",
          "title": "Primul tunel veritabil de autostradă din România mai așteaptă până la inaugurare, deși e gata. Trebuie angajat…"
        }
      ]
    },
    {
      "id": "sc-65a478442770",
      "title": "Ministrul Transporturilor: „138 km de autostradă și drum expres ar putea fi deschiși până la finalul anului”",
      "extracted_headline": "Ministrul: 138 km de autostradă și drum expres ar putea fi deschiși până la sfârșitul anului",
      "summary": "Ministrul Transporturilor a afirmat că alte 138 km de autostradă și drum expres ar putea fi deschiși până la sfârșitul anului, vizând tronsoane pe A0, A1, A3, A7 și Drumul Expres Brăila–Galați.",
      "url": "https://www.digi24.ro/stiri/economie/transporturi/ministrul-transporturilor-138-km-de-autostrada-si-drum-expres-ar-putea-fi-deschisi-pana-la-finalul-anului-4028249",
      "published_at": "2026-11-09T14:29:00Z",
      "roads": [
        "A0",
        "A1",
        "A3",
        "A7",
        "DEx6"
      ],
      "lot_id": "lot-a0-nord-l1",
      "lot_ids": [
        "lot-a0-nord-l1",
        "lot-a3-nad-zimbor",
        "lot-a3-suplacu-chiribis",
        "lot-a7-bc-pas-l1",
        "lot-a7-bc-pas-l2",
        "lot-dex6"
      ],
      "source": {
        "id": "digi24",
        "name": "Digi24",
        "trust_tier": 2
      },
      "co_citations": []
    },
    {
      "id": "sc-1e88137d7387",
      "title": "România ar putea sparge în 2026 recordul la kilometri noi de autostradă. Lotul de care depinde depășirea pragului din…",
      "extracted_headline": "România mizează pe deschideri înainte de finalul anului pentru a bate recordul din 2024",
      "summary": "Oficialii anunță deschideri planificate până la finalul anului pentru mai multe loturi de pe A0, A1, A3, A7 și drumul expres Brăila–Galați.",
      "url": "https://www.economica.net/romania-kilometri-autostrada-2_993603.html",
      "published_at": "2026-11-09T14:23:18Z",
      "roads": [
        "A0",
        "A1",
        "A3",
        "A7",
        "DEx6"
      ],
      "lot_id": "lot-a0-nord-l1",
      "lot_ids": [
        "lot-a0-nord-l1",
        "lot-a1-pit-sb-s4",
        "lot-a3-nad-zimbor",
        "lot-a3-suplacu-chiribis",
        "lot-dex6"
      ],
      "source": {
        "id": "economica",
        "name": "Economica.net",
        "trust_tier": 2
      },
      "co_citations": []
    },
    {
      "id": "sc-710f81800b90",
      "title": "Autostrada Ploiesti – Brasov: Un sfert din forajele solicitate de prestator au fost aprobate",
      "extracted_headline": "Stadiul forajelor și termenele pentru Studiul de Fezabilitate A3 Ploiești–Brașov",
      "summary": "Studiul de Fezabilitate pentru Autostrada A3 Ploiești–Brașov are progres limitat la foraje: până la începutul lunii noiembrie 2026 s-au executat 4.692 m, reprezentând 13,97% din forajele aprobate.",
      "url": "https://arenaconstruct.ro/autostrada-ploiesti-brasov-un-sfert-din-forajele-solicitate-de-prestator-au-fost-aprobate",
      "published_at": "2026-11-09T11:22:02Z",
      "roads": [
        "A3"
      ],
      "lot_id": null,
      "lot_ids": [],
      "source": {
        "id": "arenaconstruct",
        "name": "Arena Construcțiilor",
        "trust_tier": 2
      },
      "co_citations": []
    },
    {
      "id": "sc-c4a99f13abbc",
      "title": "Veste bună pentru șoferi! Miercuri vor fi dați în circulație încă 13 kilometri din Autostrada Bucureștiului",
      "extracted_headline": "Se deschid 13 km din A0 Nord între Afumați și Glina pe 4 noiembrie 2026",
      "summary": "Ministerul Transporturilor anunță deschiderea spre trafic a 13 kilometri din A0 Nord, între Afumați și Glina, pe 4 noiembrie 2026.",
      "url": "https://www.mediafax.ro/economic/veste-buna-pentru-soferi-miercuri-vor-fi-dati-in-circulatie-inca-13-kilometri-din-autostrada-bucurestiului-23836720",
      "published_at": "2026-11-03T12:23:47Z",
      "roads": [
        "A0",
        "A1",
        "A3",
        "A7",
        "DEx6"
      ],
      "lot_id": "lot-a0-nord-l3",
      "lot_ids": [
        "lot-a0-nord-l1",
        "lot-a0-nord-l3",
        "lot-a0-nord-l4"
      ],
      "source": {
        "id": "mediafax",
        "name": "Mediafax",
        "trust_tier": 2
      },
      "co_citations": [
        {
          "id": "art-8f4fcca85f68",
          "source_name": "HotNews",
          "url": "https://hotnews.ro/cati-kilometri-de-autostrada-are-romania-acum-dupa-inagurarea-de-pe-centura-capitalei-a0-ce-alte-loturi-au-sanse-sa-mai-fie-deschise-in-acest-an-2394705",
          "title": "Câți kilometri de autostradă are România acum, după inaugurarea de pe Centura Capitalei A0. Ce alte loturi au șanse să…"
        },
        {
          "id": "art-64a4298f8246",
          "source_name": "Economedia",
          "url": "https://economedia.ro/autostrada-a0-scurteaza-drumul-ploiesti-constanta.html",
          "title": "Autostrada A0 scurtează drumul Ploiești–Constanța cu aproape 40 de minute. Șoferii pot evita Centura Bucureștiului și…"
        },
        {
          "id": "art-1e0ae5e7a5f2",
          "source_name": "HotNews",
          "url": "https://hotnews.ro/s-a-deschis-circulatia-pe-autostrada-de-centura-a-capitalei-a0-pe-primul-si-singurul-lot-construit-de-chinezi-in-romania-2394838",
          "title": "S-a deschis circulația pe Autostrada de Centură a Capitalei A0, pe primul și singurul lot construit de chinezi în…"
        },
        {
          "id": "art-783365e73540",
          "source_name": "Mediafax",
          "url": "https://www.mediafax.ro/politic/doua-noi-loturi-din-a0-inaugurate-miercuri-grindeanu-inca-13-kilometri-pe-sectiunea-afumati-glina-au-fost-deschisi-23837451",
          "title": "Două noi loturi din A0, inaugurate miercuri. Grindeanu: Încă 13 kilometri, pe secțiunea Afumați-Glina, au fost deschiși"
        },
        {
          "id": "art-382a11a4b267",
          "source_name": "Economedia",
          "url": "https://economedia.ro/video-autostrada-a0-nord-s-a-deschis-circulatia-pe-loturile-3-si-4-cei-13-kilometri-dintre-afumati-si-glina-asigura-legatura-directa-intre-a3-si-a2.html",
          "title": "VIDEO | Autostrada A0 Nord: S-a deschis circulația pe loturile 3 și 4. Cei 13 kilometri dintre Afumați și Glina…"
        },
        {
          "id": "art-193b3189fe1a",
          "source_name": "Profit.ro",
          "url": "https://www.profit.ro/povesti-cu-profit/auto-transporturi/video-foto-a-fost-deschis-tronsonul-de-autostrada-amanat-cu-scandal-22938563",
          "title": "VIDEO&FOTO A fost deschis tronsonul de autostradă amânat cu scandal"
        },
        {
          "id": "art-2fb1aefd97ba",
          "source_name": "Asociația Pro Infrastructură",
          "url": "https://proinfrastructura.ro/luari-de-pozitie/de-maine-avem-a0-fara-intrerupere-intre-dn1-otopeni-si-a2-cernica",
          "title": "De mâine, avem A0 fără întrerupere între DN1 (Otopeni) și A2 (Cernica)"
        },
        {
          "id": "art-ac73b9a4a95a",
          "source_name": "Economedia",
          "url": "https://economedia.ro/autostrada-a0-va-asigura-circulatia-fara-intrerupere-intre-dn1-si-a2-de-miercuri-se-deschid-13-kilometri-din-nordul-capitalei-cu-intarzieri-de-pana-la-noua-luni.html",
          "title": "Autostrada A0 va asigura circulația fără întrerupere între DN1 și A2, de miercuri. Se deschid 13 kilometri din nordul…"
        },
        {
          "id": "art-bd21593802fe",
          "source_name": "G4Media",
          "url": "https://www.g4media.ro/miercuri-se-deschide-un-nou-lot-pe-a0-nord-13-kilometri-in-plus-intre-afumati-si-glina.html",
          "title": "Miercuri se deschide un nou lot pe A0 Nord / 13 kilometri în plus, între Afumați și Glina"
        },
        {
          "id": "art-ae019ebf5f33",
          "source_name": "Digi24",
          "url": "https://www.digi24.ro/stiri/economie/transporturi/inca-doua-loturi-din-autostrada-de-centura-a-bucurestiului-urmeaza-sa-se-deschida-soferii-vor-putea-ajunge-direct-de-pe-a3-pe-a2-4019927",
          "title": "Încă două loturi din autostrada de centură a Bucureștiului urmează să se deschidă. Șoferii vor putea ajunge direct de…"
        },
        {
          "id": "art-93e98c580779",
          "source_name": "HotNews",
          "url": "https://hotnews.ro/video-se-deschide-traficul-pe-autostrada-de-centura-a-capitalei-pe-tronsonul-amanat-cu-scandal-anuntul-ministrului-transporturilor-2393538",
          "title": "VIDEO Se deschide traficul pe Autostrada de Centură a Capitalei, pe tronsonul amânat cu scandal. Anunțul ministrului…"
        },
        {
          "id": "art-366b63e09731",
          "source_name": "Profit.ro",
          "url": "https://www.profit.ro/povesti-cu-profit/auto-transporturi/video-foto-anunt-tronsonul-de-autostrada-amanat-cu-scandal-va-fi-deschis-maine-22931224",
          "title": "VIDEO&FOTO ANUNȚ Tronsonul de autostradă amânat cu scandal va fi deschis mâine"
        },
        {
          "id": "art-1dcddb84ec3e",
          "source_name": "Adevărul",
          "url": "https://adevarul.ro/economie/inca-13-kilometri-din-autostrada-bucurestiului-se-2568612.html",
          "title": "Încă 13 kilometri din Autostrada Bucureștiului se deschid miercuri. Legătură directă între A2 și A3"
        },
        {
          "id": "art-05df43395d09",
          "source_name": "Economedia",
          "url": "https://economedia.ro/autostrada-a0-nord-este-gata-intre-afumati-si-glina-deschiderea-oficiala-miercuri-4-noiembrie-inaugurarea-promisa-pe-26-octombrie-a-fost-ratata.html",
          "title": "VIDEO | Autostrada A0 Nord este gata între Afumați și Glina. Deschiderea oficială, miercuri, 4 noiembrie, de la ora…"
        }
      ]
    },
    {
      "id": "sc-27902d76b6e9",
      "title": "Autostrada Transilvania: lotul 3C2 Chiribiș-Biharia se apropie de 90% execuție",
      "extracted_headline": "Lotul Chiribiș‑Biharia al A3 avansează la 87% din execuție, cu finalizare estimată la 2026",
      "summary": "Lucrările de asfaltare pe lotul Chiribiș‑Biharia al Autostrăzii Transilvania (A3) au atins 87% din stadiul fizic la sfârșitul lui octombrie.",
      "url": "https://www.cnir.ro/autostrada-transilvania-lotul-3c2-chiribis-biharia-se-apropie-de-90-executie",
      "published_at": "2026-11-02T10:23:30Z",
      "roads": [
        "A3"
      ],
      "lot_id": "lot-a3-chiribis-biharia",
      "lot_ids": [
        "lot-a3-chiribis-biharia"
      ],
      "source": {
        "id": "cnir",
        "name": "Compania Națională de Investiții Rutiere",
        "trust_tier": 1
      },
      "co_citations": [
        {
          "id": "art-fe536e38d288",
          "source_name": "Digi24",
          "url": "https://www.digi24.ro/digieconomic/consumer/inca-un-lot-din-autostrada-transilvania-este-aproape-finalizat-cand-se-va-putea-circula-pe-ruta-chiribis-biharia-125369",
          "title": "Încă un lot din autostrada Transilvania este aproape finalizat. Când se va putea circula pe ruta Chiribiș-Biharia |…"
        },
        {
          "id": "art-6ab7d495ad13",
          "source_name": "Economedia",
          "url": "https://economedia.ro/video-autostrada-transilvania-a3-constructorul-asfalteaza-lotul-chiribis-biharia-ajuns-la-87-executie-peste-300-de-utilaje-pe-santier.html",
          "title": "VIDEO | Autostrada Transilvania A3: Constructorul asfaltează lotul Chiribiș – Biharia, ajuns la 87% execuție. Peste…"
        }
      ]
    },
    {
      "id": "sc-c7ed0e8c1c84",
      "title": "Autostrada Transilvania: Încă 30 de kilometri ar putea fi deschiși circulației la jumătatea lunii decembrie",
      "extracted_headline": "Autostrada Transilvania: segmentul Nădășelu‑Zimbor ar putea fi deschis la 15 decembrie",
      "summary": "Asociația Pro Infrastructură estimează că tronsonul Nădășelu‑Zimbor al Autostrăzii Transilvania ar putea intra în trafic în jurul datei de 15 decembrie.",
      "url": "https://www.mediafax.ro/economic/autostrada-transilvania-inca-30-de-kilometri-ar-putea-fi-deschisi-circulatiei-la-jumatatea-lunii-decembrie-23835415",
      "published_at": "2026-11-01T17:16:13Z",
      "roads": [
        "A3"
      ],
      "lot_id": null,
      "lot_ids": [],
      "source": {
        "id": "mediafax",
        "name": "Mediafax",
        "trust_tier": 2
      },
      "co_citations": [
        {
          "id": "art-7f990298df5d",
          "source_name": "Economedia",
          "url": "https://economedia.ro/autostrada-transilvania-a3-circulatia-pe-lotul-nadaselu-zimbor-ar-putea-fi-deschisa-in-jurul-datei-de-15-decembrie-umb-intarzie-lucrarile-dar-turcii-de-la-ozaltin-ar-putea-termina-viaduct.html",
          "title": "Autostrada Transilvania A3: Circulația pe lotul Nădășelu – Zimbor ar putea fi deschisă în jurul datei de 15 decembrie"
        },
        {
          "id": "art-39452384c3d8",
          "source_name": "Asociația Pro Infrastructură",
          "url": "https://proinfrastructura.ro/luari-de-pozitie/a3-nadaselu-zimbor-deschidere-in-jur-de-15-decembrie",
          "title": "A3 Nădășelu-Zimbor, deschidere în jur de 15 decembrie"
        },
        {
          "id": "art-24f65b7db6a0",
          "source_name": "Adevărul",
          "url": "https://adevarul.ro/stiri-interne/evenimente/inca-30-de-kilometri-din-autostrada-transilvania-2568148.html",
          "title": "Încă 30 de kilometri din Autostrada Transilvania ar putea fi deschiși în decembrie. Anunțul Pro Infrastructură"
        },
        {
          "id": "art-9e2221ba35e4",
          "source_name": "G4Media",
          "url": "https://www.g4media.ro/posibila-inaugurare-pe-autostrada-transilvania-30-de-kilometri-ar-putea-fi-deschisi-la-jumatatea-lunii-decembrie.html",
          "title": "Posibilă inaugurare pe Autostrada Transilvania / 30 de kilometri ar putea fi deschiși la jumătatea lunii decembrie"
        },
        {
          "id": "art-3193ecedd4bc",
          "source_name": "Adevărul",
          "url": "https://adevarul.ro/stiri-interne/evenimente/viaductul-peste-cimitirul-din-nadaselu-aproape-2567412.html",
          "title": "Viaductul peste cimitirul din Nădășelu, aproape gata. Ce mai e de făcut pentru deschiderea a 30 de kilometri din…"
        }
      ]
    },
    {
      "id": "sc-c15732c4d657",
      "title": "Top constructori autostrăzi: Makyol, Danlin XXL și Pizzarotti - Retter au avut cele mai mari progese în ultimele două…",
      "extracted_headline": "Progrese semnificative pe A13, A0, A3, A1 și A7; loturi A13 ajung peste 40% fizic",
      "summary": "Articolul raportează progrese fizice recente pe mai multe loturi de autostradă din România, cele mai mari fiind pe loturi din A13, A8 și A0.",
      "url": "https://www.economica.net/top-constructori-autostrazi-25_990095.html",
      "published_at": "2026-11-01T16:40:44Z",
      "roads": [
        "A13",
        "A8",
        "A0",
        "A3",
        "A1",
        "A7"
      ],
      "lot_id": "lot-a13-l4",
      "lot_ids": [
        "lot-a1-pit-sb-s3",
        "lot-a1-pit-sb-s4",
        "lot-a13-l1",
        "lot-a13-l2",
        "lot-a13-l4"
      ],
      "source": {
        "id": "economica",
        "name": "Economica.net",
        "trust_tier": 2
      },
      "co_citations": []
    },
    {
      "id": "sc-c47ade84212d",
      "title": "FOTO | Cum arată lotul Suplacu de Barcău – Chiribiș al Autostrăzii Transilvania. Construcții Erbașu anunță că…",
      "extracted_headline": "Lotul Suplacu de Barcău – Chiribiș al A3 se apropie de final, deschiderea estimată în decembrie 2026",
      "summary": "Lotul de 26,35 km al Autostrăzii Transilvania (A3) este aproape finalizat, lucrările începând în ianuarie 2025.",
      "url": "https://economedia.ro/foto-cum-arata-lotul-suplacu-de-barcau-chiribis-al-autostrazii-transilvania-constructii-erbasu-anunta-ca-circulatia-ar-putea-incepe-in-curand.html",
      "published_at": "2026-10-31T08:55:21Z",
      "roads": [
        "A3"
      ],
      "lot_id": "lot-a3-suplacu-chiribis",
      "lot_ids": [
        "lot-a3-suplacu-chiribis"
      ],
      "source": {
        "id": "economedia",
        "name": "Economedia",
        "trust_tier": 2
      },
      "co_citations": []
    },
    {
      "id": "sc-f7302b924cd7",
      "title": "Autostrada A3 Transilvania: Lucrările la viaducte impun restricții de circulație pe DN1F, la Topa Mică",
      "extracted_headline": "Restricții de circulație pe DN1F pentru lucrări la viaductele A3 Transilvania la Topa Mică",
      "summary": "Pe DN1F, la intrarea în Topa Mică, circulația va fi restricționată vineri 30 octombrie pentru montarea sistemului de scurgere la viaductul A3.",
      "url": "https://economedia.ro/autostrada-a3-transilvania-lucrarile-la-viaducte-impun-restrictii-de-circulatie-pe-dn1f-la-topa-mica.html",
      "published_at": "2026-10-29T10:35:21Z",
      "roads": [
        "A3"
      ],
      "lot_id": "lot-a3-gilau-nadaselu",
      "lot_ids": [
        "lot-a3-gilau-nadaselu",
        "lot-a3-suplacu-chiribis"
      ],
      "source": {
        "id": "economedia",
        "name": "Economedia",
        "trust_tier": 2
      },
      "co_citations": []
    },
    {
      "id": "sc-d540c0c64a6f",
      "title": "Gafă a ministrului Transporturilor, în vizită pe șantierul autostrăzii Sibiu - Pitești: „Am fost şi în tunelul Momoa”",
      "extracted_headline": "Ministrul Transporturilor a confundat tunelul Momaia cu Momoa și anunță deschiderea lotului 4 Sibiu‑Piteşti",
      "summary": "Ministrul Transporturilor a greșit numele tunelului Momaia, spunând „Momoa”.",
      "url": "https://www.digi24.ro/stiri/economie/transporturi/gafa-a-ministrului-transporturilor-in-vizita-pe-santierul-autostrazii-sibiu-pitesti-am-fost-si-in-tunelul-momoa-4012749",
      "published_at": "2026-10-28T20:03:56Z",
      "roads": [
        "A3"
      ],
      "lot_id": "lot-a1-pit-sb-s4",
      "lot_ids": [
        "lot-a1-pit-sb-s4"
      ],
      "source": {
        "id": "digi24",
        "name": "Digi24",
        "trust_tier": 2
      },
      "co_citations": []
    },
    {
      "id": "sc-2329ec411280",
      "title": "UPDATE: NU se deschid astăzi cei 13 km din Autostrada Bucureștiului A0 Nord, între Afumați, Pantelimon și A2 / CNAIR…",
      "extracted_headline": "Loturile 3 și 4 ale A0 Nord nu se deschid în octombrie, deschiderea amânată până la sfârșitul lui 2026",
      "summary": "Consiliul Județean Ilfov a anunțat că deschiderea loturilor 3 și 4 ale autostrăzii A0 Nord este amânată până la sfârșitul anului 2026, fără o dată confirmată de CNAIR.",
      "url": "https://economedia.ro/se-deschid-astazi-inca-13-km-din-autostrada-bucurestiului-a0-nord-intre-afumati-pantelimon-si-a2-lotul-3-intarziat-cu-un-an-va-permite-circulatia-continua-intre-a1-a2-si-a3-precum-si-dn1.html",
      "published_at": "2026-10-26T05:00:32Z",
      "roads": [
        "A0",
        "A3",
        "A7",
        "DEx6",
        "A1"
      ],
      "lot_id": "lot-a0-nord-l3",
      "lot_ids": [
        "lot-a0-nord-l3",
        "lot-a0-nord-l4"
      ],
      "source": {
        "id": "economedia",
        "name": "Economedia",
        "trust_tier": 2
      },
      "co_citations": [
        {
          "id": "art-e30ff85c1cb1",
          "source_name": "Arena Construcțiilor",
          "url": "https://arenaconstruct.ro/ce-tronsoane-de-drum-de-mare-viteza-vor-fi-deschise-pana-la-finalul-anului-de-cnair",
          "title": "Ce tronsoane de drum de mare viteza vor fi deschise pana la finalul anului de CNAIR – ARENA Constructiilor – stiri din…"
        },
        {
          "id": "art-920c15e6763f",
          "source_name": "Digi24",
          "url": "https://www.digi24.ro/stiri/economie/transporturi/circulatia-pe-a0-nord-amanata-spre-finalul-anului-un-fost-oficial-din-min-transporturilor-anuntase-ca-inaugurarea-va-avea-loc-luni-4009681",
          "title": "Circulaţia pe A0 Nord, amânată spre finalul anului. Un fost oficial din Min. Transporturilor anunţase că inaugurarea…"
        },
        {
          "id": "art-1f51cba79892",
          "source_name": "Adevărul",
          "url": "https://adevarul.ro/politica/horatiu-cosma-il-acuza-pe-seful-psd-ca-a-amanat-2566659.html",
          "title": "Horațiu Cosma îl acuză pe șeful PSD că a amânat deschiderea A0 Nord: „Pistol, la ordinul lui Grindeanu, le-a ordonat…"
        },
        {
          "id": "art-2cf6176ebbde",
          "source_name": "Economedia",
          "url": "https://economedia.ro/horatiu-cosma-acuza-o-amanare-politica-a-deschiderii-loturilor-3-si-4-ale-a0-nord-grindeanu-si-pistol-au-spus-nu.html",
          "title": "Horațiu Cosma acuză o amânare politică a deschiderii loturilor 3 și 4 ale A0 Nord: „Grindeanu și Pistol au spus NU”"
        },
        {
          "id": "art-f07cd40ae6e1",
          "source_name": "Economedia",
          "url": "https://economedia.ro/loturile-3-si-4-ale-a0-nord-ar-urma-sa-fie-deschise-pana-la-sfarsitul-anului-anunta-cj-ilfov-cnair-nu-confirma-inca-un-termen.html",
          "title": "Loturile 3 și 4 ale A0 Nord ar urma să fie deschise până la sfârșitul anului, anunță CJ Ilfov. CNAIR nu confirmă încă…"
        }
      ]
    },
    {
      "id": "sc-1aaf303ffc56",
      "title": "Autostrada A3 Chiribis – Biharia: Diferente mari intre ritmul lucrarilor si cel al platilor",
      "extracted_headline": "Diferențe mari între ritmul lucrărilor și al plăților la secțiunea Chiribiș‑Biharia a autostrăzii A3",
      "summary": "Contractul pentru secțiunea Chiribiș‑Biharia a A3, semnat la 3 aprilie 2024 pentru 785,22 milioane lei, este executat de Precon Transilvania SRL și Citadina SA.",
      "url": "https://arenaconstruct.ro/autostrada-a3-chiribis-biharia-diferente-mari-intre-ritmul-lucrarilor-si-cel-al-platilor",
      "published_at": "2026-10-23T10:22:23Z",
      "roads": [
        "A3"
      ],
      "lot_id": "lot-a3-chiribis-biharia",
      "lot_ids": [
        "lot-a3-chiribis-biharia"
      ],
      "source": {
        "id": "arenaconstruct",
        "name": "Arena Construcțiilor",
        "trust_tier": 2
      },
      "co_citations": []
    },
    {
      "id": "sc-f66772fa6400",
      "title": "Circulația pe două noi secțiuni ale Autostrăzii Transilvania (A3) ar putea fi deschisă până la finalul anului",
      "extracted_headline": "Deschiderea secţiunilor noi ale Autostrăzii Transilvania (A3) ar putea fi până la sfârșitul anului",
      "summary": "Directorul CNAIR a confirmat că se lucrează la secţiunile Nădăşelu‑Zimbor și Suplacu de Barcău‑Chiribiş ale A3, cu progres de peste 95 %.",
      "url": "https://www.digi24.ro/stiri/economie/transporturi/circulatia-pe-doua-noi-sectiuni-ale-autostrazii-transilvania-a3-ar-putea-fi-deschisa-pana-la-finalul-anului-4004647",
      "published_at": "2026-10-22T14:17:17Z",
      "roads": [
        "A3"
      ],
      "lot_id": "lot-a3-suplacu-chiribis",
      "lot_ids": [
        "lot-a3-suplacu-chiribis"
      ],
      "source": {
        "id": "digi24",
        "name": "Digi24",
        "trust_tier": 2
      },
      "co_citations": []
    },
    {
      "id": "sc-34d7fb981dda",
      "title": "Doar pentru cunoscători și pasionați: cu avionul pe A3 Poarta-Zimbor",
      "extracted_headline": "A3 Poarta‑Zimbor: primul tronson deschis în august, iar devierile spre Nădășelu se așteaptă în decembrie",
      "summary": "Primul tronson de 12,24 km al autostrăzii A3, dintre Poarta Sălajului și Zimbor, a fost inaugurat pe 11 august 2024.",
      "url": "https://proinfrastructura.ro/luari-de-pozitie/doar-pentru-cunoscatori-si-pasionati-cu-avionul-pe-a3-poarta-zimbor",
      "published_at": "2026-10-07T19:31:45Z",
      "roads": [
        "A3"
      ],
      "lot_id": "lot-a3-zimbor-ps",
      "lot_ids": [
        "lot-a3-nad-ps",
        "lot-a3-zimbor-ps"
      ],
      "source": {
        "id": "proinfrastructura",
        "name": "Asociația Pro Infrastructură",
        "trust_tier": 2
      },
      "co_citations": []
    },
    {
      "id": "sc-c4b6b7004845",
      "title": "A3 Nușfalău-Poarta Sălajului, perla coroanei în premieră din avion!",
      "extracted_headline": "Autostrada A3 Nușfalău‑Poarta Sălajului: contract de 6,62 mld lei, start 2025, deschidere estimată 2031",
      "summary": "După ani de amânări, lotul A3 Nușfalău‑Poarta Sălajului a primit contractul de 6,62 miliarde lei în aprilie 2025 cu Makyol‑Ozaltin.",
      "url": "https://proinfrastructura.ro/luari-de-pozitie/a3-nusfalau-poarta-salajului-perla-coroanei-in-premiera-din-avion",
      "published_at": "2026-10-04T19:38:30Z",
      "roads": [
        "A3"
      ],
      "lot_id": "lot-a3-ps-nusf",
      "lot_ids": [
        "lot-a3-ps-nusf"
      ],
      "source": {
        "id": "proinfrastructura",
        "name": "Asociația Pro Infrastructură",
        "trust_tier": 2
      },
      "co_citations": []
    },
    {
      "id": "sc-1a45f7b3df50",
      "title": "Din avion acum, pe 1 decembrie la volan pe A3 Chiribiș-Suplacu de Barcău",
      "extracted_headline": "Inaugurarea pe 1 decembrie a segmentului A3 Suplacu de Barcău – Chiribiș",
      "summary": "Autoritățile au confirmat data de 1 decembrie pentru deschiderea segmentului de 26,35 km A3 dintre Suplacu de Barcău și Chiribiș.",
      "url": "https://proinfrastructura.ro/luari-de-pozitie/din-avion-acum-pe-1-decembrie-la-volan-pe-a3-chiribis-suplacu-de-barcau",
      "published_at": "2026-10-02T19:37:20Z",
      "roads": [
        "A3"
      ],
      "lot_id": "lot-a3-suplacu-chiribis",
      "lot_ids": [
        "lot-a3-suplacu-chiribis"
      ],
      "source": {
        "id": "proinfrastructura",
        "name": "Asociația Pro Infrastructură",
        "trust_tier": 2
      },
      "co_citations": []
    },
    {
      "id": "sc-da78b7328527",
      "title": "Finalizarea proiectului ”Implementarea si integrarea sistemelor ITS pe Autostrada A3 Targu Mures – Nadaselu”",
      "extracted_headline": "Finalizat proiectul ITS pe Autostrada A3 Târgu Mureș – Nădășelu",
      "summary": "Compania Națională de Administrare a Infrastructurii Rutiere a finalizat implementarea sistemelor ITS pe autostrada A3 între Târgu Mureș și Nădășelu.",
      "url": "https://www.cnadnr.ro/ro/comunicare/comunicate-de-presa/interes-general/finalizarea-proiectului-%E2%80%9Dimplementarea-si-0",
      "published_at": "2026-10-02T12:00:00Z",
      "roads": [
        "A3"
      ],
      "lot_id": null,
      "lot_ids": [],
      "source": {
        "id": "cnair",
        "name": "CNAIR Comunicate de Presă",
        "trust_tier": 1
      },
      "co_citations": []
    },
    {
      "id": "sc-28a534c6ce81",
      "title": "Autostrada Transilvania. Toate grinzile montate pe lotul 3C2 Chiribiș-Biharia",
      "extracted_headline": "Lotul 3C2 Chiribiș–Biharia (A3) ajunge la 78% execuție, toate grinzile montate",
      "summary": "Lotul Chiribiș–Biharia al Autostrăzii A3 are 78% stadiu fizic la sfârșitul lui septembrie, cu montarea grinzilor pe toate podurile și pasajele.",
      "url": "https://www.cnir.ro/autostrada-transilvania-toate-grinzile-montate-pe-lotul-3c2-chiribis-biharia",
      "published_at": "2026-10-01T07:21:08Z",
      "roads": [
        "A3"
      ],
      "lot_id": "lot-a3-chiribis-biharia",
      "lot_ids": [
        "lot-a3-chiribis-biharia"
      ],
      "source": {
        "id": "cnir",
        "name": "Compania Națională de Investiții Rutiere",
        "trust_tier": 1
      },
      "co_citations": []
    },
    {
      "id": "sc-0c1ed3c57513",
      "title": "VIDEO | Autostrada A3 lotul Nădășelu - Zimbor, aproape de finalizare",
      "extracted_headline": "Lotul A3 Nădășelu–Zimbor aproape finalizat, lucrările la 99,2% conform CNAIR",
      "summary": "Lotul Nădășelu–Zimbor din Autostrada A3 este aproape de finalizare, stadiul fizic fiind de 99,2% potrivit CNAIR.",
      "url": "https://economedia.ro/video-autostrada-transilvania-a3-lotul-a3-nadaselu-zimbor-este-aproape-de-finalizare-stadiu-de-992.html",
      "published_at": "2026-09-30T13:05:01Z",
      "roads": [
        "A3"
      ],
      "lot_id": "lot-a3-nad-zimbor",
      "lot_ids": [
        "lot-a3-nad-zimbor",
        "lot-a3-zimbor-ps"
      ],
      "source": {
        "id": "economedia",
        "name": "Economedia",
        "trust_tier": 2
      },
      "co_citations": []
    },
    {
      "id": "sc-f58f781e3c4a",
      "title": "ANUNȚ DE PRESĂ 10.08.2026",
      "extracted_headline": "Deschiderea circulației pe noul lot A3 Zimbor – Poarta Sălajului, 11 august 2026",
      "summary": "Marţi, 11 august 2026, CNAIR a organizat o conferinţă de presă la nodul rutier Românași pentru a anunţa deschiderea circulaţiei pe noul lot al autostrăzii A3, între Zimbor şi Poarta Sălajului.",
      "url": "https://www.cnadnr.ro/ro/comunicare/comunicate-de-presa/interes-general/anun%C8%9B-de-pres%C4%83-10082026",
      "published_at": "2026-08-10T12:00:00Z",
      "roads": [
        "A3"
      ],
      "lot_id": "lot-a3-zimbor-ps",
      "lot_ids": [
        "lot-a3-zimbor-ps"
      ],
      "source": {
        "id": "cnair",
        "name": "CNAIR Comunicate de Presă",
        "trust_tier": 1
      },
      "co_citations": []
    },
    {
      "id": "sc-cfec9df26190",
      "title": "Semnarea contractului de finantare pentru „Autostrada Transilvania, secțiunea Nușfalău – Biharia, inclusiv drumul de…",
      "extracted_headline": "Semnarea contractului de finanțare pentru Autostrada Transilvania, secțiunea Nușfalău‑Biharia (etapa a II‑a)",
      "summary": "La 29 aprilie 2026 a fost semnat contractul de finanțare nr. 144/2026 pentru secțiunea Nușfalău‑Biharia a Autostrăzii Transilvania, parte a Programului Transport 2021‑2027.",
      "url": "https://www.cnadnr.ro/ro/comunicare/comunicate-de-presa/interes-general/semnarea-contractului-de-finantare-pentru-%E2%80%9Eautostrada",
      "published_at": "2026-07-09T12:00:00Z",
      "roads": [
        "A3"
      ],
      "lot_id": null,
      "lot_ids": [],
      "source": {
        "id": "cnair",
        "name": "CNAIR Comunicate de Presă",
        "trust_tier": 1
      },
      "co_citations": []
    },
    {
      "id": "sc-51bafac6da3f",
      "title": "Autostrada Transilvania, secțiunea Nădășelu – Poarta Sălajului",
      "extracted_headline": "Autostrada Transilvania, secțiunea Nădășelu – Poarta Sălajului: detalii de finanțare și valoare",
      "summary": "Proiectul de 42,30 km de autostradă Nădășelu – Poarta Sălajului are o valoare totală de 2,33 miliarde lei și este cofinanțat din fonduri europene și bugetul național.",
      "url": "https://www.cnadnr.ro/ro/comunicare/comunicate-de-presa/interes-general/autostrada-transilvania-sec%C8%9Biunea-n%C4%83d%C4%83%C8%99elu-%E2%80%93-poarta",
      "published_at": "2026-01-14T12:00:00Z",
      "roads": [
        "A3"
      ],
      "lot_id": null,
      "lot_ids": [],
      "source": {
        "id": "cnair",
        "name": "CNAIR Comunicate de Presă",
        "trust_tier": 1
      },
      "co_citations": []
    },
    {
      "id": "sc-aed87e1e103f",
      "title": "„Acces rutier complementar A3, Descarcare Comarnic”",
      "extracted_headline": "Acces rutier complementar la autostrada A3 în zona Comarnic – proiect de 470 milioane lei",
      "summary": "Proiectul prevede un drum de acces complementar la A3, cu lungimea de 5,898 km, pentru a fluidiza traficul pe DN1 în zona Comarnic‑Breaza.",
      "url": "https://www.cnadnr.ro/ro/comunicare/comunicate-de-presa/interes-general/%E2%80%9Eacces-rutier-complementar-a3-descarcare-comarnic%E2%80%9D",
      "published_at": "2026-01-14T12:00:00Z",
      "roads": [
        "A3"
      ],
      "lot_id": null,
      "lot_ids": [],
      "source": {
        "id": "cnair",
        "name": "CNAIR Comunicate de Presă",
        "trust_tier": 1
      },
      "co_citations": []
    },
    {
      "id": "sc-2cae2dca6dd2",
      "title": "“Autostrada Transilvania, secțiunea Nădășelu – Poarta Sălajului”",
      "extracted_headline": "Autostrada Transilvania, secţiunea Nădășelu – Poarta Sălajului, contract şi finanţare aprobată",
      "summary": "Ministerul Transporturilor şi Infrastructurii a semnat contractul de finanţare pentru secţiunea A3 Nădășelu – Poarta Sălajului, cu o valoare totală de 2,33 miliarde lei.",
      "url": "https://www.cnadnr.ro/ro/comunicare/comunicate-de-presa/interes-general/%E2%80%9Cautostrada-transilvania-sec%C8%9Biunea-n%C4%83d%C4%83%C8%99elu-%E2%80%93-poarta",
      "published_at": "2025-12-30T12:00:00Z",
      "roads": [
        "A3"
      ],
      "lot_id": null,
      "lot_ids": [],
      "source": {
        "id": "cnair",
        "name": "CNAIR Comunicate de Presă",
        "trust_tier": 1
      },
      "co_citations": []
    },
    {
      "id": "sc-e28afbe4a2eb",
      "title": "“Acces rutier complementar A3, Descarcare Comarnic”",
      "extracted_headline": "Acces rutier complementar la A3 în zona Comarnic – proiect finanțat și în execuție",
      "summary": "Proiectul „Acces rutier complementar A3, Descarcare Comarnic” vizează modernizarea unui segment de 5,898 km la vestul orașului Comarnic, cu poduri, pasaje și intersecții giratorii.",
      "url": "https://www.cnadnr.ro/ro/comunicare/comunicate-de-presa/interes-general/%E2%80%9Cacces-rutier-complementar-a3-descarcare-comarnic%E2%80%9D",
      "published_at": "2025-12-29T12:00:00Z",
      "roads": [
        "A3"
      ],
      "lot_id": null,
      "lot_ids": [],
      "source": {
        "id": "cnair",
        "name": "CNAIR Comunicate de Presă",
        "trust_tier": 1
      },
      "co_citations": []
    },
    {
      "id": "sc-66d311493bcc",
      "title": "Drum expres pentru realizarea conexiunii dintre Autostrada A3 (Zona Turda) si Drum National DN1 (zona Tureni)",
      "extracted_headline": "Drum expres Turda–Tureni: 4,957 km, finanțare UE, finalizare până în 2029",
      "summary": "Proiectul prevede construirea a 4,957 km de drum expres care va lega Autostrada A3 la km 21+900 de DN1 la km 457+750, în zona Turda‑Tureni.",
      "url": "https://www.cnadnr.ro/ro/comunicare/comunicate-de-presa/interes-general/drum-expres-pentru-realizarea-conexiunii-dintre",
      "published_at": "2025-11-04T12:00:00Z",
      "roads": [
        "A3"
      ],
      "lot_id": null,
      "lot_ids": [],
      "source": {
        "id": "cnair",
        "name": "CNAIR Comunicate de Presă",
        "trust_tier": 1
      },
      "co_citations": []
    },
    {
      "id": "sc-f5cbbbc93763",
      "title": "Elaborare Studiu de fezabilitate pentru Drum de legătură &lt;&lt;Descărcare trafic Şimleu Silvaniei&gt;&gt; la…",
      "extracted_headline": "Studiu de fezabilitate pentru legătura Șimleu Silvaniei la autostrada A3",
      "summary": "Ministerul Transporturilor și CNAIR au semnat contractul de finanțare nr. 119/2025 pentru elaborarea studiului de fezabilitate a drumului de legătură la autostrada A3.",
      "url": "https://www.cnadnr.ro/ro/comunicare/comunicate-de-presa/interes-general/elaborare-studiu-de-fezabilitate-pentru-drum-de",
      "published_at": "2025-10-28T12:00:00Z",
      "roads": [
        "A3"
      ],
      "lot_id": null,
      "lot_ids": [],
      "source": {
        "id": "cnair",
        "name": "CNAIR Comunicate de Presă",
        "trust_tier": 1
      },
      "co_citations": []
    },
    {
      "id": "sc-00bbba81d15b",
      "title": "Autostrada Transilvania, secțiunea Nușfalău - Biharia, inclusiv drumul de legătură la Municipiul Oradea",
      "extracted_headline": "Autostrada Transilvania: Secțiunea Nușfalău-Biharia și legătura cu Oradea",
      "summary": "În 2025, Ministerul Transporturilor a semnat contractul de finanțare pentru Autostrada Transilvania, secțiunea Nușfalău-Biharia, inclusiv drumul de legătură la Oradea.",
      "url": "https://www.cnadnr.ro/ro/comunicare/comunicate-de-presa/interes-general/autostrada-transilvania-sec%C8%9Biunea-nu%C8%99fal%C4%83u-biharia-0",
      "published_at": "2025-06-02T12:00:00Z",
      "roads": [
        "A3"
      ],
      "lot_id": null,
      "lot_ids": [],
      "source": {
        "id": "cnair",
        "name": "CNAIR Comunicate de Presă",
        "trust_tier": 1
      },
      "co_citations": []
    },
    {
      "id": "sc-6702a6a73bb0",
      "title": "CNIR a preluat proiectul Autostrăzii Ploiești – Brașov. Budescu: Ne propunem să lansăm în licitație sectorul de…",
      "extracted_headline": "CNIR preia contractul pentru studiul şi proiectul tehnic al A3 Ploiești–Brașov; se pregătește licitația pentru Cristi...",
      "summary": "CNIR a preluat contractul pentru completarea Studiului de Fezabilitate și realizarea Proiectului Tehnic al Autostrăzii A3 Ploiești–Brașov și analizează documentația preluată.",
      "url": "https://economedia.ro/cnir-a-preluat-proiectul-autostrazii-ploiesti-brasov-budescu-ne-propunem-sa-lansam-in-licitatie-sectorul-de-autostrada-cristian-codlea.html",
      "published_at": "2025-02-07T15:59:13Z",
      "roads": [
        "A3"
      ],
      "lot_id": "lot-a3-cristian-codlea",
      "lot_ids": [
        "lot-a3-cristian-codlea"
      ],
      "source": {
        "id": "economedia",
        "name": "Economedia",
        "trust_tier": 2
      },
      "co_citations": []
    },
    {
      "id": "sc-293786529c92",
      "title": "CNAIR a desemnat câștigătorul licitației pentru concesionarea unor spații de servicii și parcări situate pe A3 și DEx…",
      "extracted_headline": "OMV Petrom Marketing a câștigat licitația pentru spații de servicii și parcări pe A3 și DEx12",
      "summary": "Compania OMV PETROM MARKETING a fost desemnată câștigătoarea licitației pentru concesionarea spațiilor de servicii și parcări pe autostrada A3 și drumul expres DEx12 Craiova‑Pitești.",
      "url": "https://www.cnadnr.ro/ro/comunicare/comunicate-de-presa/interes-general/cnair-desemnat-c%C3%A2%C8%99tig%C4%83torul-licita%C8%9Biei-pentru-8",
      "published_at": "2025-02-06T12:00:00Z",
      "roads": [
        "A3",
        "DEx12"
      ],
      "lot_id": null,
      "lot_ids": [],
      "source": {
        "id": "cnair",
        "name": "CNAIR Comunicate de Presă",
        "trust_tier": 1
      },
      "co_citations": []
    },
    {
      "id": "sc-71f8fd5444ea",
      "title": "Elaborare Studiu de Fezabilitate și Proiect Tehnic de Execuție pentru realizarea a 9 noduri rutiere pe Autostrăzile…",
      "extracted_headline": "Studiu de fezabilitate și proiect tehnic pentru 9 noduri pe autostrăzile A1, A2 și A3",
      "summary": "CNAIR a lansat un proiect de elaborare a studiului de fezabilitate și a proiectului tehnic pentru nouă noduri rutiere pe autostrăzile A1, A2 și A3.",
      "url": "https://www.cnadnr.ro/ro/comunicare/comunicate-de-presa/interes-general/elaborare-studiu-de-fezabilitate-%C8%99i-proiect-tehnic-57",
      "published_at": "2024-12-20T12:00:00Z",
      "roads": [
        "A1",
        "A2",
        "A3"
      ],
      "lot_id": null,
      "lot_ids": [],
      "source": {
        "id": "cnair",
        "name": "CNAIR Comunicate de Presă",
        "trust_tier": 1
      },
      "co_citations": []
    },
    {
      "id": "sc-449e172dc2f7",
      "title": "Oferte depuse pentru concesionarea unor spații de servicii și parcări pe A3 și DX12, Craiova – Pitești!",
      "extracted_headline": "Oferte depuse pentru concesionarea spațiilor de servicii și parcări pe A3 și DX12",
      "summary": "Marţi, 17 septembrie 2024, au fost depuse ofertele pentru concesionarea a opt spaţii de servicii şi patru parcări de scurtă durată amplasate pe autostrada A3 şi pe drumul expres DX12 Craiova‑Piteşti.",
      "url": "https://www.cnadnr.ro/ro/comunicare/comunicate-de-presa/interes-general/oferte-depuse-pentru-concesionarea-unor-spa%C8%9Bii-de",
      "published_at": "2024-09-17T12:00:00Z",
      "roads": [
        "A3",
        "DEx12"
      ],
      "lot_id": null,
      "lot_ids": [],
      "source": {
        "id": "cnair",
        "name": "CNAIR Comunicate de Presă",
        "trust_tier": 1
      },
      "co_citations": []
    },
    {
      "id": "sc-60179af5c57d",
      "title": "Implementarea și integrarea sistemelor ITS pe Autostrada A3 Târgu Mureș – Nădășelu",
      "extracted_headline": "Implementarea sistemelor ITS pe autostrada A3 Tg. Mureș – Nădășelu, finanțat prin PNRR",
      "summary": "Proiectul vizează dotarea cu sisteme ITS a sectoarelor A3 Tg. Mureș – Ogra, Ogra – Câmpia Turzii și Câmpia Turzii – Gilău, inclusiv construcția unui Centru de Monitorizare și Informare.",
      "url": "https://www.cnadnr.ro/ro/comunicare/comunicate-de-presa/interes-general/implementarea-%C8%99i-integrarea-sistemelor-its-pe-0",
      "published_at": "2024-09-16T12:00:00Z",
      "roads": [
        "A3"
      ],
      "lot_id": null,
      "lot_ids": [],
      "source": {
        "id": "cnair",
        "name": "CNAIR Comunicate de Presă",
        "trust_tier": 1
      },
      "co_citations": []
    },
    {
      "id": "sc-99413a8fba49",
      "title": "Termenul limită de depunere a ofertelor pentru 12 contracte de concesionare a unor spații de servicii pe rețeaua…",
      "extracted_headline": "Termenul limită pentru depunerea ofertelor la 12 concesiuni pe A3, A4, A10 și DEx Craiova‑Pitești este 29 august 2024",
      "summary": "CNAIR a stabilit că termenul de depunere a ofertelor pentru cele 12 contracte de concesiune pe autostrăzile A3, A4, A10 și pe DEx Craiova‑Pitești este 29.08.2024.",
      "url": "https://www.cnadnr.ro/ro/comunicare/comunicate-de-presa/interes-general/termenul-limit%C4%83-de-depunere-ofertelor-pentru-12",
      "published_at": "2024-08-13T12:00:00Z",
      "roads": [
        "A3",
        "A4",
        "A10",
        "DEx12"
      ],
      "lot_id": null,
      "lot_ids": [],
      "source": {
        "id": "cnair",
        "name": "CNAIR Comunicate de Presă",
        "trust_tier": 1
      },
      "co_citations": []
    },
    {
      "id": "sc-33c412a1cea4",
      "title": "Elaborare Studiu de Fezabilitate si Proiect Tehnic de Executie pentru realizarea a 9 noduri rutiere pe Autostrazile…",
      "extracted_headline": "Studiu de fezabilitate pentru 9 noduri rutiere pe A1, A2, A3",
      "summary": "CNAIR a depus cererea de finanțare pentru elaborarea studiului de fezabilitate și proiectului tehnic de execuție pentru 9 noduri rutiere pe autostrăzile A1, A2 și A3.",
      "url": "https://www.cnadnr.ro/ro/comunicare/comunicate-de-presa/interes-general/elaborare-studiu-de-fezabilitate-si-proiect-tehnic-56",
      "published_at": "2024-07-18T12:00:00Z",
      "roads": [
        "A1",
        "A2",
        "A3"
      ],
      "lot_id": null,
      "lot_ids": [],
      "source": {
        "id": "cnair",
        "name": "CNAIR Comunicate de Presă",
        "trust_tier": 1
      },
      "co_citations": []
    },
    {
      "id": "sc-4d2d7669670b",
      "title": "Autostrada Transilvania, sectiunea Nadaselu - Poarta Salajului",
      "extracted_headline": "Autostrada Transilvania: Nadaselu – Poarta Salajului, noul contract de finanțare PNRR",
      "summary": "În data de 3 iunie 2024, CNAIR și Ministerul Transporturilor au semnat Actul Adițional nr.5 la Contractul de Finanțare nr. 6/28.10.2022 pentru proiectul Autostrada Transilvania, secțiunea Nadaselu – Poarta Salajului.",
      "url": "https://www.cnadnr.ro/ro/comunicare/comunicate-de-presa/interes-general/autostrada-transilvania-sectiunea-nadaselu-poarta-0",
      "published_at": "2024-06-06T12:00:00Z",
      "roads": [
        "A3"
      ],
      "lot_id": null,
      "lot_ids": [],
      "source": {
        "id": "cnair",
        "name": "CNAIR Comunicate de Presă",
        "trust_tier": 1
      },
      "co_citations": []
    },
    {
      "id": "sc-3aa0c20fd840",
      "title": "Sistem de monitorizare si informare asupra traficului si a conditiilor de circulatie pentru Autostrada A1 Bucuresti…",
      "extracted_headline": "Proiect de monitorizare ITS pentru autostrăzile A1, A2, A3 și DN1 în România",
      "summary": "CNAIR a depus cererea de finanțare pentru un sistem ITS pe autostrăzile A1, A2, A3 și DN1.",
      "url": "https://www.cnadnr.ro/ro/comunicare/comunicate-de-presa/interes-general/sistem-de-monitorizare-si-informare-asupra-traficului",
      "published_at": "2024-05-28T12:00:00Z",
      "roads": [
        "A1",
        "A2",
        "A3"
      ],
      "lot_id": null,
      "lot_ids": [],
      "source": {
        "id": "cnair",
        "name": "CNAIR Comunicate de Presă",
        "trust_tier": 1
      },
      "co_citations": []
    },
    {
      "id": "sc-5cabc9715f30",
      "title": "Autostrada Ploiești - Brașov: Contractul de proiectare demarat în 2021, prelungit până în 2031 UPDATE - Economica.net",
      "extracted_headline": "Proiectarea Autostrăzii Ploiești–Brașov: contract din 2021, termen prelungit până în 2031 pentru asistență",
      "summary": "Contractul pentru studiul de fezabilitate şi proiectul tehnic al Autostrăzii Ploiești–Brașov a demarat în 2021 şi a avut termene succesiv prelungite.",
      "url": "https://www.economica.net/autostrada-ploiesti-brasov_745614.html",
      "published_at": "2024-05-10T10:33:34Z",
      "roads": [
        "A3"
      ],
      "lot_id": "lot-a3-cristian-codlea",
      "lot_ids": [
        "lot-a3-cristian-codlea"
      ],
      "source": {
        "id": "economica",
        "name": "Economica.net",
        "trust_tier": 2
      },
      "co_citations": []
    },
    {
      "id": "sc-9f3bc88a32c5",
      "title": "Privind finalizarea proiectului ”Autostrada București-Brașov, secțiunea București-Ploiești, sector 1, km 0+000-km…",
      "extracted_headline": "Finalizarea Autostrăzii București-Ploiești (A1) și nodurile Centura și Moara Vlăsiei",
      "summary": "Autostrada București-Ploiești (A1) a fost finalizată, incluzând nodurile Centura București km 6+500 și Moara Vlăsiei km 19+500.",
      "url": "https://www.cnadnr.ro/ro/comunicare/comunicate-de-presa/interes-general/privind-finalizarea-proiectului-%E2%80%9Dautostrada-bucure%C8%99ti",
      "published_at": "2024-01-30T12:00:00Z",
      "roads": [
        "A3"
      ],
      "lot_id": null,
      "lot_ids": [],
      "source": {
        "id": "cnair",
        "name": "CNAIR Comunicate de Presă",
        "trust_tier": 1
      },
      "co_citations": []
    },
    {
      "id": "sc-f328a324c880",
      "title": "Elaborare Studiu de Fezabilitate si Proiect Tehnic de Executie pentru realizarea a 9 noduri rutiere pe Autostrazile…",
      "extracted_headline": "Studiu de fezabilitate pentru 9 noduri rutiere pe A1, A2, A3",
      "summary": "Autoritatea a semnat un act adițional pentru elaborarea studiului de fezabilitate și proiectului tehnic de execuție pentru 9 noduri rutiere pe autostrăzile A1, A2 și A3.",
      "url": "https://www.cnadnr.ro/ro/comunicare/comunicate-de-presa/interes-general/elaborare-studiu-de-fezabilitate-si-proiect-tehnic-55",
      "published_at": "2024-01-18T12:00:00Z",
      "roads": [
        "A1",
        "A2",
        "A3"
      ],
      "lot_id": null,
      "lot_ids": [],
      "source": {
        "id": "cnair",
        "name": "CNAIR Comunicate de Presă",
        "trust_tier": 1
      },
      "co_citations": []
    }
  ],
  "milestones": [
    {
      "lot_id": "lot-a3-buc-petricani",
      "lot_name": "București (Șos. Petricani) – Centura A0",
      "type": "open",
      "label": "Dat în trafic",
      "date": "2018-12-14",
      "source_label": "Oficial CNAIR",
      "quote": "Deschidere oficială pe București (Șos. Petricani) – Centura A0 la data de 2018-12-14"
    },
    {
      "lot_id": "lot-a3-buc-petricani",
      "lot_name": "București (Șos. Petricani) – Centura A0",
      "type": "contractual",
      "label": "Termen contractual",
      "date": "2017-11",
      "source_label": "Contract semnat",
      "quote": "Termen contractual stabilit la semnarea contractului: 2017-11"
    },
    {
      "lot_id": "lot-a3-buc-pl",
      "lot_name": "Centura București (A0) – Ploiești (Bărcănești)",
      "type": "open",
      "label": "Dat în trafic",
      "date": "2012-07-19",
      "source_label": "Oficial CNAIR",
      "quote": "Deschidere oficială pe Centura București (A0) – Ploiești (Bărcănești) la data de 2012-07-19"
    },
    {
      "lot_id": "lot-a3-buc-pl",
      "lot_name": "Centura București (A0) – Ploiești (Bărcănești)",
      "type": "contractual",
      "label": "Termen contractual",
      "date": "2012-06",
      "source_label": "Contract semnat",
      "quote": "Termen contractual stabilit la semnarea contractului: 2012-06"
    },
    {
      "lot_id": "lot-a3-rasnov",
      "lot_name": "Râșnov – Cristian",
      "type": "open",
      "label": "Dat în trafic",
      "date": "2020-12-17",
      "source_label": "Oficial CNAIR",
      "quote": "Deschidere oficială pe Râșnov – Cristian la data de 2020-12-17"
    },
    {
      "lot_id": "lot-a3-rasnov",
      "lot_name": "Râșnov – Cristian",
      "type": "contractual",
      "label": "Termen contractual",
      "date": "2020-10",
      "source_label": "Contract semnat",
      "quote": "Termen contractual stabilit la semnarea contractului: 2020-10"
    },
    {
      "lot_id": "lot-a3-tgm-ungheni",
      "lot_name": "Târgu Mureș – Ungheni",
      "type": "open",
      "label": "Dat în trafic",
      "date": "2021-12-06",
      "source_label": "Oficial CNAIR",
      "quote": "Deschidere oficială pe Târgu Mureș – Ungheni la data de 2021-12-06"
    },
    {
      "lot_id": "lot-a3-tgm-ungheni",
      "lot_name": "Târgu Mureș – Ungheni",
      "type": "contractual",
      "label": "Termen contractual",
      "date": "2021-11",
      "source_label": "Contract semnat",
      "quote": "Termen contractual stabilit la semnarea contractului: 2021-11"
    },
    {
      "lot_id": "lot-a3-ungheni-ogra",
      "lot_name": "Ungheni – Ogra",
      "type": "open",
      "label": "Dat în trafic",
      "date": "2018-12-12",
      "source_label": "Oficial CNAIR",
      "quote": "Deschidere oficială pe Ungheni – Ogra la data de 2018-12-12"
    },
    {
      "lot_id": "lot-a3-ungheni-ogra",
      "lot_name": "Ungheni – Ogra",
      "type": "contractual",
      "label": "Termen contractual",
      "date": "2016-06",
      "source_label": "Contract semnat",
      "quote": "Termen contractual stabilit la semnarea contractului: 2016-06"
    },
    {
      "lot_id": "lot-a3-ogra-iernut",
      "lot_name": "Ogra – Iernut",
      "type": "open",
      "label": "Dat în trafic",
      "date": "2018-12-12",
      "source_label": "Oficial CNAIR",
      "quote": "Deschidere oficială pe Ogra – Iernut la data de 2018-12-12"
    },
    {
      "lot_id": "lot-a3-ogra-iernut",
      "lot_name": "Ogra – Iernut",
      "type": "contractual",
      "label": "Termen contractual",
      "date": "2016-05",
      "source_label": "Contract semnat",
      "quote": "Termen contractual stabilit la semnarea contractului: 2016-05"
    },
    {
      "lot_id": "lot-a3-iernut-chetani",
      "lot_name": "Iernut – Chețani",
      "type": "open",
      "label": "Dat în trafic",
      "date": "2020-09-18",
      "source_label": "Oficial CNAIR",
      "quote": "Deschidere oficială pe Iernut – Chețani la data de 2020-09-18"
    },
    {
      "lot_id": "lot-a3-iernut-chetani",
      "lot_name": "Iernut – Chețani",
      "type": "contractual",
      "label": "Termen contractual",
      "date": "2017-07",
      "source_label": "Contract semnat",
      "quote": "Termen contractual stabilit la semnarea contractului: 2017-07"
    },
    {
      "lot_id": "lot-a3-chetani-ct",
      "lot_name": "Chețani – Câmpia Turzii",
      "type": "open",
      "label": "Dat în trafic",
      "date": "2023-12-21",
      "source_label": "Oficial CNAIR",
      "quote": "Deschidere oficială pe Chețani – Câmpia Turzii la data de 2023-12-21"
    },
    {
      "lot_id": "lot-a3-chetani-ct",
      "lot_name": "Chețani – Câmpia Turzii",
      "type": "contractual",
      "label": "Termen contractual",
      "date": "2024-08",
      "source_label": "Contract semnat",
      "quote": "Termen contractual stabilit la semnarea contractului: 2024-08"
    },
    {
      "lot_id": "lot-a3-2b-ct-gilau",
      "lot_name": "Secțiunea 2B: Câmpia Turzii – Turda – Gilău",
      "type": "open",
      "label": "Dat în trafic",
      "date": "2010-11-13",
      "source_label": "Oficial CNAIR",
      "quote": "Deschidere oficială pe Secțiunea 2B: Câmpia Turzii – Turda – Gilău la data de 2010-11-13"
    },
    {
      "lot_id": "lot-a3-2b-ct-gilau",
      "lot_name": "Secțiunea 2B: Câmpia Turzii – Turda – Gilău",
      "type": "contractual",
      "label": "Termen contractual",
      "date": "2010-12",
      "source_label": "Contract semnat",
      "quote": "Termen contractual stabilit la semnarea contractului: 2010-12"
    },
    {
      "lot_id": "lot-a3-gilau-nadaselu",
      "lot_name": "Subsecțiunea 3A1: Gilău – Nădășelu",
      "type": "open",
      "label": "Dat în trafic",
      "date": "2018-09-28",
      "source_label": "Oficial CNAIR",
      "quote": "Deschidere oficială pe Subsecțiunea 3A1: Gilău – Nădășelu la data de 2018-09-28"
    },
    {
      "lot_id": "lot-a3-gilau-nadaselu",
      "lot_name": "Subsecțiunea 3A1: Gilău – Nădășelu",
      "type": "contractual",
      "label": "Termen contractual",
      "date": "2016-04",
      "source_label": "Contract semnat",
      "quote": "Termen contractual stabilit la semnarea contractului: 2016-04"
    },
    {
      "lot_id": "lot-a3-nad-zimbor",
      "lot_name": "Subsecțiunile 3A2 + 3B1: Nădășelu – Mihăiești – Zimbor",
      "type": "estimated",
      "label": "Deschidere estimată",
      "date": "2026-12",
      "source_label": "Grafic de execuție",
      "quote": "Deschidere estimată conform raportărilor: 2026-12"
    },
    {
      "lot_id": "lot-a3-nad-zimbor",
      "lot_name": "Subsecțiunile 3A2 + 3B1: Nădășelu – Mihăiești – Zimbor",
      "type": "contractual",
      "label": "Termen contractual",
      "date": "2026-10-22",
      "source_label": "Contract semnat",
      "quote": "Termen contractual stabilit la semnarea contractului: 2026-10-22"
    },
    {
      "lot_id": "lot-a3-zimbor-ps",
      "lot_name": "Subsecțiunea 3B2: Zimbor – Poarta Sălajului",
      "type": "open",
      "label": "Dat în trafic",
      "date": "2026-08-11",
      "source_label": "Oficial CNAIR",
      "quote": "Deschidere oficială pe Subsecțiunea 3B2: Zimbor – Poarta Sălajului la data de 2026-08-11"
    },
    {
      "lot_id": "lot-a3-ps-nusf",
      "lot_name": "Subsecțiunile 3B3 + 3B4: Poarta Sălajului – Zalău – Nușfalău (Tunel Meseș)",
      "type": "estimated",
      "label": "Deschidere estimată",
      "date": "2031",
      "source_label": "Grafic de execuție",
      "quote": "Deschidere estimată conform raportărilor: 2031"
    },
    {
      "lot_id": "lot-a3-ps-nusf",
      "lot_name": "Subsecțiunile 3B3 + 3B4: Poarta Sălajului – Zalău – Nușfalău (Tunel Meseș)",
      "type": "contractual",
      "label": "Termen contractual",
      "date": "2032-05",
      "source_label": "Contract semnat",
      "quote": "Termen contractual stabilit la semnarea contractului: 2032-05"
    },
    {
      "lot_id": "lot-a3-nusf-suplacu",
      "lot_name": "Subsecțiunea 3B5: Nușfalău – Suplacu de Barcău",
      "type": "open",
      "label": "Dat în trafic",
      "date": "2023-09-21",
      "source_label": "Oficial CNAIR",
      "quote": "Deschidere oficială pe Subsecțiunea 3B5: Nușfalău – Suplacu de Barcău la data de 2023-09-21"
    },
    {
      "lot_id": "lot-a3-suplacu-chiribis",
      "lot_name": "Subsecțiunea 3C1: Suplacu de Barcău – Chiribiș",
      "type": "estimated",
      "label": "Deschidere estimată",
      "date": "2026-12",
      "source_label": "Grafic de execuție",
      "quote": "Deschidere estimată conform raportărilor: 2026-12"
    },
    {
      "lot_id": "lot-a3-suplacu-chiribis",
      "lot_name": "Subsecțiunea 3C1: Suplacu de Barcău – Chiribiș",
      "type": "contractual",
      "label": "Termen contractual",
      "date": "2026-08",
      "source_label": "Contract semnat",
      "quote": "Termen contractual stabilit la semnarea contractului: 2026-08"
    },
    {
      "lot_id": "lot-a3-chiribis-biharia",
      "lot_name": "Subsecțiunea 3C2: Chiribiș – Biharia",
      "type": "estimated",
      "label": "Deschidere estimată",
      "date": "2026-12",
      "source_label": "Grafic de execuție",
      "quote": "Deschidere estimată conform raportărilor: 2026-12"
    },
    {
      "lot_id": "lot-a3-chiribis-biharia",
      "lot_name": "Subsecțiunea 3C2: Chiribiș – Biharia",
      "type": "contractual",
      "label": "Termen contractual",
      "date": "2027-05",
      "source_label": "Contract semnat",
      "quote": "Termen contractual stabilit la semnarea contractului: 2027-05"
    },
    {
      "lot_id": "lot-a3-biharia-bors",
      "lot_name": "Subsecțiunea 3C3: Biharia – Borș II (frontieră HU)",
      "type": "open",
      "label": "Dat în trafic",
      "date": "2020-09-04",
      "source_label": "Oficial CNAIR",
      "quote": "Deschidere oficială pe Subsecțiunea 3C3: Biharia – Borș II (frontieră HU) la data de 2020-09-04"
    },
    {
      "lot_id": "lot-a3-biharia-bors",
      "lot_name": "Subsecțiunea 3C3: Biharia – Borș II (frontieră HU)",
      "type": "contractual",
      "label": "Termen contractual",
      "date": "2020-07",
      "source_label": "Contract semnat",
      "quote": "Termen contractual stabilit la semnarea contractului: 2020-07"
    }
  ]
}