  "id": "lot-a7-pl-bz-l3",
  "lot_id": "lot-a7-pl-bz-l3",
  "name": "Lotul 3: Pietroasele – Buzău",
  "lot_name": "Lotul 3: Pietroasele – Buzău",
  "road_id": "a7",
  "road_ref": "A7",
  "road_name": "A7 Autostrada Moldovei",
  "section_id": "sec-a7-pl-bz",
  "section_name": "Ploiești – Buzău",
  "length_km": 13.9,
  "open_km": 13.9,
  "profile": "motorway",
  "contractor": "Asocierea Nurol – Makyol",
  "contract_value": "1.093 mld. lei (fără TVA)",
  "financing": "PNRR",
  "tender_stage": "work_commenced",
  "progress_percent": null,
  "contractual_date": "2025-11",
  "estimated_date": null,
  "actual_date": "2025-11-27",
  "status": "open",
  "status_label": "Deschis",
  "status_detail": "Deschis: 13,9 km",
  "bbox": [
    26.744097,
    45.080563,
    26.878872,
    45.130448
  ],
  "claims": [],
  "stories": [],
  "provenance": {
    "progress_percent": {
      "source": "TVR Info",
      "tier": 2,
      "url": "https://tvrinfo.ro/lotul-3-al-autostrazii-ploiesti-buzau-deschis-circulatie-neintrerupta-pe-autostrada-de-la-bucuresti-la-focsani/",
      "quote": "Lotul 3, Ploiești – Buzău, a fost finalizat.",
      "date": "2025-11-27"
    },
    "contractor": {
      "source": "Economica.net (Agerpres)",
      "tier": 2,
      "url": "https://www.economica.net/autostrada-moldova-a7-ploiesti-buzau-lotul-3-ultimul-sector-pnrr-fara-constructor-turcii-au-fost-desemnati-din-nou-castigatori-pentru-cei-14-kilometri_701367.html",
      "quote": "Asocierea de constructori turci Nurol Inşaat Ve Ticaret A.S.- Makyol Insaat Sanayi Turizm Ve Ticaret A.S",
      "date": "2023-10-23"
    },
    "contract_value": {
      "source": "Economica.net (Agerpres)",
      "tier": 2,
      "url": "https://www.economica.net/autostrada-moldova-a7-ploiesti-buzau-lotul-3-ultimul-sector-pnrr-fara-constructor-turcii-au-fost-desemnati-din-nou-castigatori-pentru-cei-14-kilometri_701367.html",
      "quote": "cu preţul de 1.093.470.823,76 lei fără TVA",
      "date": "2023-10-23"
    },
    "financing": {
      "source": "Economica.net (Agerpres)",
      "tier": 2,
      "url": "https://www.economica.net/autostrada-moldova-a7-ploiesti-buzau-lotul-3-ultimul-sector-pnrr-fara-constructor-turcii-au-fost-desemnati-din-nou-castigatori-pentru-cei-14-kilometri_701367.html",
      "quote": "Sursa de finanţare este asigurată din Planul Naţional de Redresare şi Rezilienţă (PNRR).",
      "date": "2023-10-23"
    },
    "contractual_date": {
      "source": "Economica.net (Agerpres)",
      "tier": 2,
      "url": "https://www.economica.net/autostrada-moldova-a7-ploiesti-buzau-lotul-3-ultimul-sector-pnrr-fara-constructor-turcii-au-fost-desemnati-din-nou-castigatori-pentru-cei-14-kilometri_701367.html",
      "quote": "durata de execuţie a lucrărilor este de 20 de luni",
      "date": "2023-10-23"
    },
    "actual_date": {
      "source": "TVR Info",
      "tier": 2,
      "url": "https://tvrinfo.ro/lotul-3-al-autostrazii-ploiesti-buzau-deschis-circulatie-neintrerupta-pe-autostrada-de-la-bucuresti-la-focsani/",
      "quote": "Lotul 3, Ploiești – Buzău, a fost finalizat.",
      "date": "2025-11-27"
    },
    "status": {
      "source": "TVR Info",
      "tier": 2,
      "url": "https://tvrinfo.ro/lotul-3-al-autostrazii-ploiesti-buzau-deschis-circulatie-neintrerupta-pe-autostrada-de-la-bucuresti-la-focsani/",
      "quote": "Autostrada Moldovei A7 s-a extins cu aproape 14 km, odată cu deschiderea lotului dintre Pietroasele și Buzău.",
      "date": "2025-11-27"
    }
  },
  "attributed_range": null,
  "is_hand_drawn": false
}