{
  "id": "lot-a1-deva-lg-l1",
  "lot_id": "lot-a1-deva-lg-l1",
  "name": "Deva – Lugoj, Lot 1: Șanovița – Balinț – Traian Vuia",
  "lot_name": "Deva – Lugoj, Lot 1: Șanovița – Balinț – Traian Vuia",
  "road_id": "a1",
  "road_ref": "A1",
  "road_name": "A1 București – Pitești – Sibiu – Deva – Timișoara – Arad – Nădlac",
  "section_id": "sec-a1-deva-lg",
  "section_name": "Deva – Lugoj",
  "length_km": 27.62,
  "open_km": 27.62,
  "profile": "motorway",
  "contractor": "Asocierea Tirrena Scavi – Societa Italiana per Condotte d'Acqua – Cossi Costruzioni",
  "contract_value": "681.04 mil. lei (fără TVA)",
  "financing": "Fondul de Coeziune (POS-T / POIM) / Buget de stat",
  "tender_stage": "work_commenced",
  "progress_percent": null,
  "contractual_date": "2013-04",
  "estimated_date": null,
  "actual_date": "2015-12-23",
  "status": "open",
  "status_label": "Deschis",
  "status_detail": "Deschis: 27,6 km",
  "bbox": [
    21.722887,
    45.774343,
    22.064313,
    45.817401
  ],
  "claims": [],
  "stories": [],
  "provenance": {
    "progress_percent": {
      "source": "Economica.net",
      "tier": 2,
      "url": "https://www.economica.net/verificari-pe-autostrada-lugoj-deva-fisuri-noi-descoperite-pe-lotul-1-inclusiv-in-terasament_152811.html",
      "quote": "a fost deschis parţial circulaţiei pe o porţiune de 17 km (între Traian Vuia şi Balint) în decembrie 2013, iar doi ani mai târziu pe restul de 10 km (Balint – Sanovita)",
      "date": "2018-04-22"
    },
    "contractor": {
      "source": "HotNews",
      "tier": 2,
      "url": "https://hotnews.ro/stadiul-lucrarilor-pe-autostrada-a1-timisoara-lugoj-lot-2-care-sunt-sansele-sa-fie-deschisa-anul-acesta-502103",
      "quote": "Tirrena Scavi – firma constructoare (...) au fost rezolvate si ca finalizarea lucrarilor pe cei 26 de km",
      "date": "2015-10-15"
    },
    "contract_value": {
      "source": "HotNews",
      "tier": 2,
      "url": "https://hotnews.ro/stadiul-lucrarilor-pe-autostrada-a1-timisoara-lugoj-lot-2-care-sunt-sansele-sa-fie-deschisa-anul-acesta-502103",
      "quote": "certificate Interimare de Plata, in valoare de 311.395.440,86 Lei fara TVA",
      "date": "2015-10-15"
    },
    "financing": {
      "source": "HotNews",
      "tier": 2,
      "url": "https://hotnews.ro/stadiul-lucrarilor-pe-autostrada-a1-timisoara-lugoj-lot-2-care-sunt-sansele-sa-fie-deschisa-anul-acesta-502103",
      "quote": "finantat din fonduri europene nerambursabile POS-T si bugetul de stat",
      "date": "2015-10-15"
    },
    "contractual_date": {
      "source": "HotNews",
      "tier": 2,
      "url": "https://hotnews.ro/stadiul-lucrarilor-pe-autostrada-a1-timisoara-lugoj-lot-2-care-sunt-sansele-sa-fie-deschisa-anul-acesta-502103",
      "quote": "termenul de la executia lucrarilor pana la solicitarea la plata a acestora de catre Antreprenor",
      "date": "2015-10-15"
    },
    "actual_date": {
      "source": "Economica.net",
      "tier": 2,
      "url": "https://www.economica.net/verificari-pe-autostrada-lugoj-deva-fisuri-noi-descoperite-pe-lotul-1-inclusiv-in-terasament_152811.html",
      "quote": "a fost deschis parţial circulaţiei pe o porţiune de 17 km (între Traian Vuia şi Balint) în decembrie 2013, iar doi ani mai târziu pe restul de 10 km (Balint – Sanovita)",
      "date": "2018-04-22"
    },
    "status": {
      "source": "HotNews",
      "tier": 2,
      "url": "https://hotnews.ro/video-se-deschide-traficul-rutier-pe-autostrada-timisoara-lugoj-491324",
      "quote": "fiind inclusi si cei 10,5 km din Autostrada Lugoj – Deva, Lot I (nedeschisi traficului in anul 2013)",
      "date": "2015-12-23"
    }
  },
  "attributed_range": null,
  "is_hand_drawn": false
}